- FondsAM54 - Major Matthews collection
- SeriesS9 - First Narrows Bridge
- FileF1 - First Narrows Bridge Photographs Vol. 3
- 58 more...
- Item: CVA 265-68 - Steel work on the bridge road-bed is complete and concrete laying on road through Stanley Park finished to bridge head.
- Item: CVA 265-32 - Structural steel workers walk along narrow trestles "away up", even as you and I move along solid sidewalks. Note big crane for lifting steel.
- Item: CVA 265-30 - Stuart Cameron and Company workmen placing granite facings of South piers. Huge blocks were cut to fit and numbered and brought by barge.
- Item: CVA 265-43 - Stumps covered the ground less than a year before this picture was taken of bridge approach on North Shore
- Item: CVA 265-20 - Surveyor's stakes show cut-off of Lost Lagoon. Present road now curves almost through center of this picture. Road now flanked with pathway.
- Item: CVA 265-69 - Suspension cables enter the cable anchorage on North Shore, below the viaduct and are anchored into 20,000 tons of solid concrete.
- Item: CVA 265-37 - Taken by long-distance lens from below cable anchorage on South Shore. North Shore steel is going up. Workmen are wearing steel helmets.
- Item: CVA 265-52 - The 61 strands in each suspension cable are secured to seven steel butts shown above. These butts are set in tons of solid concrete.
- Item: CVA 265-53 - The Union Jack marks "the top" - it is tradition among steel workers to fly the flag when top is reached. "Creeper" has finished its job.