- Item: CVA 265-59 - South Shore view showing completed catwalkas from tower to tower, cables and stay-wires. Catwalks braced together near top.
- Item: CVA 265-25 - South Shore. Near the floor shown, tons of earth engulfed and and crushed a worker - the only fatality of entire bridge construction
- Item: CVA 265-39 - Steel has been erected on top of North Shore cable anchorage. One of cables is shown passing through "window" of anchorage.
- Item: CVA 265-68 - Steel work on the bridge road-bed is complete and concrete laying on road through Stanley Park finished to bridge head.
- Item: CVA 265-32 - Structural steel workers walk along narrow trestles "away up", even as you and I move along solid sidewalks. Note big crane for lifting steel.
- Item: CVA 265-30 - Stuart Cameron and Company workmen placing granite facings of South piers. Huge blocks were cut to fit and numbered and brought by barge.
- Item: CVA 265-43 - Stumps covered the ground less than a year before this picture was taken of bridge approach on North Shore
- Item: CVA 265-20 - Surveyor's stakes show cut-off of Lost Lagoon. Present road now curves almost through center of this picture. Road now flanked with pathway.
- Item: CVA 265-69 - Suspension cables enter the cable anchorage on North Shore, below the viaduct and are anchored into 20,000 tons of solid concrete.