- FondsAM54 - Major Matthews collection
- SeriesS9 - First Narrows Bridge
- FileF1 - First Narrows Bridge Photographs Vol. 3
- 46 more...
- Item: CVA 265-54 - Only the top steel-work bwetween the two pillars remains to be finished. Roadbed will be laid over the flat cross-bar.
- Item: CVA 265-50 - Painting quickly followed erection of steel. Painter shown at work on North Shore viaduct using spray-gun. Final coat is sea-green.
- Item: CVA 265-40 - Progress made on construction of pedestrian subway and overhead traffic road at causeway entrance to Stanley Park.
- Item: CVA 265-49 - Ready-built sections of catwalks were drawn up two at a time, placed in position and bolted to supporting cables.
- Item: CVA 265-12 - Rough grading of driveway through Stanley Park finished. Pathway banks have been seeded with grass
- Item: CVA 265-31 - Scow load of granite blocks for facings of the two piers. The stone and cement piers measure twenty feet in height.
- Item: CVA 265-72 - Section of suspension cable. Diameter 13 1/2 inches. Cable is wire-wrapped over a cedar covering. 1050 tons in cables.
- Item: CVA 265-65 - Sections of Bridge road-bed supported from main cables. Each section is raised from scows. Union Steamship passing.
- Item: CVA 265-33 - South face of cable anchorage on North Shore. Suspension cables enter the two "windows" and go down into concrete.
- 17 more...