- Item: CVA 265-58 - On this date the last of the 61 wire ropes which form each of the suspension cables were secured to their butts in the anchorage.
- Item: CVA 265-28 - One of the "cellars" cut out of solid blue clay will be walled with concrete for cable anchorages on South Shore. Note steel reinforced rods.
- Item: CVA 265-54 - Only the top steel-work bwetween the two pillars remains to be finished. Roadbed will be laid over the flat cross-bar.
- Item: CVA 265-50 - Painting quickly followed erection of steel. Painter shown at work on North Shore viaduct using spray-gun. Final coat is sea-green.
- Item: CVA 265-40 - Progress made on construction of pedestrian subway and overhead traffic road at causeway entrance to Stanley Park.
- Item: CVA 265-49 - Ready-built sections of catwalks were drawn up two at a time, placed in position and bolted to supporting cables.
- Item: CVA 265-12 - Rough grading of driveway through Stanley Park finished. Pathway banks have been seeded with grass
- Item: CVA 265-31 - Scow load of granite blocks for facings of the two piers. The stone and cement piers measure twenty feet in height.
- Item: CVA 265-72 - Section of suspension cable. Diameter 13 1/2 inches. Cable is wire-wrapped over a cedar covering. 1050 tons in cables.