- FondsAM54 - Major Matthews collection
- SeriesS9 - First Narrows Bridge
- FileF1 - First Narrows Bridge Photographs Vol. 3
- 33 more...
- Item: CVA 265-26 - Granite rocks were dumped inside the edge of this caisson before cement was poured. Pump is carrying off water that has seeped through.
- Item: CVA 265-60 - Grey sky and incoming tide and the new link across First Narrows. Catwalks completed and in readiness for roadbed. From West Vancouver ferry.
- Item: CVA 265-66 - In mid-June, nine of the road-bed sections are in position between the towers. Looking towards West Vancouver.
- Item: CVA 265-71 - Long distance lens gives close-up of painters and electricians putting finishing touches. Cable covering machine at work on left catwalk. These catwalks are steep!
- Item: CVA 265-61 - Long distance lens picture of first section of Bridge roadway. Steel being raised from scow to centre of span. Note the signal man.
- Item: CVA 265-38 - Long-distance lens gives close-up of bridge construction on North Shore. Tower foundations nearly complete. Old P.G.E. [Pacific Great Eastern Railway] tracks show at right.
- Item: CVA 265-57 - Looking down into east cable anchorage on South Shore, showing clamps which secure each of the 61 strands of cable to concrete.
- Item: CVA 265-16 - Looking north - viaduct now joins this structure. Traffic will run over the top of it. Viaduct concrete foundations in foreground.
- Item: CVA 265-24 - Looking south from concrete pier at end of steel work on North Shore. Steel structure of viaduct rests upon these foundations.
- 30 more...