Administration Building Site Looking West
Administration building
"A" pan installed & "E" being installed
4th [fourth] crystallizer being set in place
4th & 5th effect evaporators in place
#3 [number three] track produced into trash house for erection of beet end steel
#3 flume excavated and graded, ready to receive flume bents
#2 boiler showing tubes
1st smoke stack being set in place
1st and 2nd evaporators in place
#1 flume and tailflume forms looking south from top of pulp warehouse
Results 1901 to 1911 of 1911