Showing 538 results

Archival description
Taber (Alta.) Construction industry With digital objects
Print preview View:
1 flume and tailflume forms looking south from top of pulp warehouse
#1 flume and tailflume forms looking south from top of pulp warehouse
2 boiler showing tubes
#2 boiler showing tubes
3 flume excavated and graded, ready to receive flume bents
#3 flume excavated and graded, ready to receive flume bents
4th & 5th effect evaporators in place
4th & 5th effect evaporators in place
"A" pan installed & "E" being installed
"A" pan installed & "E" being installed
Administration Building Site Looking West
Administration Building Site Looking West
Air view of factory site, looking northwest
Air view of factory site, looking northwest
Air view of factory site, looking south
Air view of factory site, looking south
Another section of Building 19
Another section of Building 19
Applying 20 year bonded roof on cupola of Bulk Storage bins
Applying 20 year bonded roof on cupola of Bulk Storage bins
Applying the roofing to the factory garage
Applying the roofing to the factory garage
Applying waterproofing to generator pit walls and backfilling foundation wall of main building
Applying waterproofing to generator pit walls and backfilling foundation wall of main building
Area to south of pulp warehouse, showing completion of water & sewer lines
Area to south of pulp warehouse, showing completion of water & sewer lines
Assembling #3 flume, looking west towards tailflume
Assembling #3 flume, looking west towards tailflume
Assembling of pit dryer cyclones
Assembling of pit dryer cyclones
Assembling of pulp dryer cyclones
Assembling of pulp dryer cyclones
Backfilling and stripping the main flume
Backfilling and stripping the main flume
Backfilling boiler and power house foundations
Backfilling boiler and power house foundations
Backfilling of power house completed
Backfilling of power house completed
Beet end juice pumps in place on bases
Beet end juice pumps in place on bases
Beet end showing addition of one truss and foam stacks to carbonation tank
Beet end showing addition of one truss and foam stacks to carbonation tank
Beet end showing addition of the first two carbonation tanks and one Oliver filter
Beet end showing addition of the first two carbonation tanks and one Oliver filter
Beet end showing addition of two trusses, second carbonation tank, one Oliver filter
Beet end showing addition of two trusses, second carbonation tank, one Oliver filter
Beet end showing No. 1 Oliver, Dorr tank, & #3 first carbs tank
Beet end showing No. 1 Oliver, Dorr tank, & #3 first carbs tank
Beet end steel erected to date
Beet end steel erected to date
Beet Piling Area Fill
Beet Piling Area Fill
Beet pumphouse and #1 flume in foreground and tailflume extending south
Beet pumphouse and #1 flume in foreground and tailflume extending south
Beet pumphouse foundation wall forms nearing completion
Beet pumphouse foundation wall forms nearing completion
Beet pumphouse from top of pulp warehouse
Beet pumphouse from top of pulp warehouse
Beet wheel and beet washer set on foundations in wash house
Beet wheel and beet washer set on foundations in wash house
Beginning of erection of waste water pumphouse wall forms - looking south
Beginning of erection of waste water pumphouse wall forms - looking south
Bin platform showing jacks, rods
Bin platform showing jacks, rods
Bin Walls, Elevation
Bin Walls, Elevation
Bin Walls, Elevation 138
Bin Walls, Elevation 138
Bin Walls, Elevation 150
Bin Walls, Elevation 150
Bins before pouring
Bins before pouring
Block walls of locomotive shed nearing completion and sewer line excavation from pulp warehouse s...
Block walls of locomotive shed nearing completion and sewer line excavation from pulp warehouse scale pit
Body sections, and catchalls for Taber pans as fabricated in Vancouver Refinery shops
Body sections, and catchalls for Taber pans as fabricated in Vancouver Refinery shops
Boiler # 2 showing tack tubes in place
Boiler # 2 showing tack tubes in place
Boiler #1 & #2, showing baffle tile in #2
Boiler #1 & #2, showing baffle tile in #2
Boiler foundation being stripped and backfilled
Boiler foundation being stripped and backfilled
Boiler foundation forms being completed
Boiler foundation forms being completed
Boiler house structural steel complete
Boiler house structural steel complete
Boiler house structural steel with 1st forms in place
Boiler house structural steel with 1st forms in place
Boiler, dressing tube ends in foreground
Boiler, dressing tube ends in foreground
Boilers control panel
Boilers control panel
Bottom core and charge ring for Taber pans  fabricated in refinery plate shop, Vancouver
Bottom core and charge ring for Taber pans fabricated in refinery plate shop, Vancouver
Bottom of Dorr tank on location and welded
Bottom of Dorr tank on location and welded
Bringing excavation to grade
Bringing excavation to grade
Building #13 in position
Building #13 in position
Results 1 to 50 of 538