1990 Annual meeting, attendees
1990 Annual meeting, attendees
1990 Annual meeting, speeches
1st and 2nd evaporators in place
1st modern rubber Tired scoop [?] purchased by company
1st smoke stack being set in place
#2 boiler showing tubes
2 Fiji - bridge replacing, old 1 shilling bridge
2 Harvesting sugar cane, men and truck in field
2 Icing; B959 (2) 1969
2 Icing sugar B959 (1)
2 Icing sugar B959 (3)
2 Icing, B949 (2) 1969; C.H. slurry
2 Lihue, Island of Kauai, two P&H loaders powered by "Caterpillar" diesel engines loading cane cars
2 Melted granulated 3% icing series A2(1)
2 Melted granulated 3% icing series; A2(3)
2 Sugar B949 (1); C.H. slurry
2 Sugar B949 (3); C.H. slurry
2 Sugar B958 (1); NY seed
2 Sugar B958 (3); NY seed
2 Sugar C953; 750 mls; NY seed
25 cane cars [railway cane transport cars]
#3 flume excavated and graded, ready to receive flume bents
3 Harvesting sugar cane, men and truck in field
3 Icing; B959 (2) 1969
3 Icing sugar B959 (1)
3 Icing sugar B959 (3)
3 Icing, B949 (2) 1969; C.H. slurry
3 locos
3 Melted granulated 3% icing series A2(1)
3 Melted granulated 3% icing series; A2(3)
#3 [number three] track produced into trash house for erection of beet end steel
#3 [number three] warehouse
#3 [number three] warehouse
3 Sugar B949 (1); C.H. slurry
3 Sugar B949 (3); C.H. slurry
3 Sugar B958 (1); NY seed
3 Sugar B958 (3); NY seed
3 Sugar C953; 750 mls; NY seed
4 kg bags of sugar station
4 Sugar B958 (1); NY seed
4 Verite station: first 4 [four] vessels just completed
4th & 5th effect evaporators in place
4th Floor - P.H. (Pack House) No. 2 Looking S (South)
4th [fourth] crystallizer being set in place
#5 (engine) pushing at rear of loaded cane train on new grade & curve east of Casa Grande
5 Sugar B958 (1); NY seed
5 Verite station: first 4 [four] vessels just completed
6 seed per meter
#8 at Mata Mamon