Showing 74 results

Archival description
New Westminster (B.C.) Item Bridges--Design and construction Image
Print preview View:

74 results with digital objects Show results with digital objects

Removing Log Pier No. 3
Removing Log Pier No. 3
[A crowd gathers to watch a span of the bridge being floated into place]
[A crowd gathers to watch a span of the bridge being floated into place]
[A crowd watches as a spread span is floated into place]
[A crowd watches as a spread span is floated into place]
[A span of the bridge being floated into place]
[A span of the bridge being floated into place]
Abutment "A"
Abutment "A"
Coffer-Dam Pier No. 2
Coffer-Dam Pier No. 2
Completing Masonry Pier No. 3
Completing Masonry Pier No. 3
Completing Substructure
Completing Substructure
Crib, Pier No. 9
Crib, Pier No. 9
Dredging Pier No. 2
Dredging Pier No. 2
General View
General View
General View Looking South
General View Looking South
General View Looking South
General View Looking South
Portal of Spread Span
Portal of Spread Span
Removing Log [from] Pier No.3
Removing Log [from] Pier No.3
View Looking South
View Looking South
[Pier supports for the Pattullo Bridge under construction]
[Pier supports for the Pattullo Bridge under construction]
[Pattullo bridge under construction]
[Pattullo bridge under construction]
[A group of workers pose on the superstructure]
[A group of workers pose on the superstructure]
[A span secured to two piers]
[A span secured to two piers]
[A spread span is floated into position]
[A spread span is floated into position]
[Engineers and contractors gathered in the bridge camp]
[Engineers and contractors gathered in the bridge camp]
[Men standing on the front of a locomotive on the bridge]
[Men standing on the front of a locomotive on the bridge]
[Snow covers the partially completed bridge]
[Snow covers the partially completed bridge]
Abutment
Abutment
Blasting Pier 11
Blasting Pier 11
Crib, Pier No. 5
Crib, Pier No. 5
Fleet Laid Up During High Water
Fleet Laid Up During High Water
General View Looking South
General View Looking South
Land Pile Driver
Land Pile Driver
Laying Stone in Coffer-Dam
Laying Stone in Coffer-Dam
Official Opening of Bridge
Official Opening of Bridge
Sinking Pivot Pier
Sinking Pivot Pier
[A crowd gathers to watch a span of the bridge being floated into place]
[A crowd gathers to watch a span of the bridge being floated into place]
[A group of workers pose during construction of the superstructure]
[A group of workers pose during construction of the superstructure]
[A group of workers pose during the construction of a spread span]
[A group of workers pose during the construction of a spread span]
[A span being floated into place]
[A span being floated into place]
[A span ready for floating]
[A span ready for floating]
[Engineers and contractors at the bridge site]
[Engineers and contractors at the bridge site]
[Men at work inside a construction office]
[Men at work inside a construction office]
[Two men building a pier]
[Two men building a pier]
Center Line North Shore
Center Line North Shore
Crib, Pier No. 5
Crib, Pier No. 5
Crib, Pier No. 6
Crib, Pier No. 6
Cutting Edge Pier 4
Cutting Edge Pier 4
Cutting Edge Pier No. 4
Cutting Edge Pier No. 4
Dredging Pier 11
Dredging Pier 11
Fleet Laid Up During High Water
Fleet Laid Up During High Water
Floating 380 Feet Span
Floating 380 Feet Span
General View from North Shore
General View from North Shore
Results 1 to 50 of 74