Structural steel to 06 column line forming Dorr Tank foundation
- AM1592-S8-2-F02-: 2011-092.6843
- Item
- Dec. 1, 1948
Structural steel to 06 column line forming Dorr Tank foundation
General view of factory from scale house road
Diesel oil tank storage erected at left and completed
Backfilling and stripping the main flume
Completing foundation wall forms between columns
Bottom of Dorr tank on location and welded
Looking at carbonation station from beet end
Second floor, setting plate & frame presses & welding Dorr tank
Beet end showing addition of two trusses, second carbonation tank, one Oliver filter
Looking north in cupola of bulk storage bins
Beet end showing No. 1 Oliver, Dorr tank, & #3 first carbs tank
Assembling of pit dryer cyclones
Looking north at factory garage
Completion of pulp drier structural steel
Welding top cover of Dorr tank
Laying brick at east end of pulp warehouse
View of tailflume from pulp warehouse showing forms for #2 flume junction in place
Junction of #3 and tailflume - looking east along #3
Rivetting the wet hopper superstructure
Forms for garage foundation nearing completion
Power house footings before erection of foundation wall forms
Pouring west end at beet pumphouse forms for retaining wall being erected at left
Erecting wall forms for beet pumphouse
Forming powerhouse foundation walls
Pouring outside foundation wall for power and boiler house
Working on junction of #1 and tail flume at beet pumphouse
Waste waer pump installation looking north
Boiler house structural steel with 1st forms in place
Main building steel from bulk storage bins
Excavating for water line to beet flumes
Forming third lift walls on power & boiler house
Completed form for second wall lift of pulp drier building
First lift wall forms for beet end
Looking north at start of third lift for pulp drier building wall
Pouring first lift of power & boiler house walls
Forms for limerock unloading ramp in foregraound & installing windows in boiler house
South elevation of pulp drier & main building
General view of second floor showing third lift wall forms under construction
Pouring second lift of main building walls
Looking east at beet end of main building showing first lift stripped and third lift being erected
South elevation of power and boiler house walls showing completed power house walls
Pulp dryer furnace with the burners in place.
Steam traps & piping at hot water collecting tanks