Verite: manufacture at old asphalt plant
- AM1592-1-S2-F06-: 2011-092.3026
- Item
- Dec. 18, 1957
141 results with digital objects Show results with digital objects
Verite: manufacture at old asphalt plant
Verite: manufacture at old asphalt plant
Verite: hoisting into building
Verite: manufacture at old asphalt plant
Centrifugal No. 8 - broken coupling between drive motor and centr[al?] basket shaft
Damage done during collapse of No. 2 RGS [Rogers Golden Syrup] & invert tank
Vertite station construction - rigging for placing vessels
New cube press in machine shop - front view
Centrifugal No. 8 - broken coupling between drive motor and centr[al?] basket shaft
Damage to reduction gear "E" pan stirrer
Sugar conditioning - silos - handling equipment
Sugar conditioning - silos - handling equipment
Sugar conditioning - silos - handling equipment
Powerhouse equipment at time of completion: feed pumps, 100 hp - 3600 rpm
Western States Refined centrifugal
Powerhouse equipment at time of completion: turbine governor, desuperheating control panel
Powerhouse equipment at time of completion: two 1800 kW west generators desuperheating control panel
Machine shop at time of completion of powerhouse
Filter house: refinery hot water tank with new heat exchanger (9th floor)
Union special bag sewing machine
Item consists of a copy negative made of an illustration from the catalogue Filled-Bag Closing Machines: Classes 14500 and 14600 of the Union Special Machine Co., found at AM1592-S8-F86, page 15.
Machine shop and miscellaneous
Damage done during collapse of No. 2 RGS [Rogers Golden Syrup] & invert tank
Vertite station construction - hoisting of vessels
Centrifugal No. 8 - broken coupling between drive motor and centr[al?] basket shaft
Centrifugal No. 8 - broken coupling between drive motor and centr[al?] basket shaft
Damage to reduction gear "E" pan stirrer
New cube press in machine shop - front view
Research & development - instruments
Packing machinery - Barber Coleman envelope packer - front view
Packing station - soft sugar - digital scale
Powerhouse equipment at time of completion: left: power house control panel
Powerhouse equipment at time of completion: above: deaerator platform, below: feed pump pit
Type of telephone first used at BC Sugar Refinery