- COV-S663-: CVA 800-1936
- Item
- Sept. 1972
Part of City of Vancouver fonds
Photograph shows two different pieces of hoe equipment.
Part of City of Vancouver fonds
Photograph shows two different pieces of hoe equipment.
Trucks and Equipment [1 of 13]
Part of City of Vancouver fonds
Trucks and Equipment [8 of 13]
Part of City of Vancouver fonds
Image shows garbage truck near pile of refuse.
Trucks and Equipment [11 of 13]
Part of City of Vancouver fonds
Image shows man power washing garbage truck with Mercury truck in foreground.
Trucks and Equipment [13 of 13]
Part of City of Vancouver fonds
Image shows pile of refuse.
Infrastructure and 1987-1990 Capital [1 of 138]
Part of City of Vancouver fonds
Part of City of Vancouver fonds
Part of City of Vancouver fonds
WHC APWA [American Public Works Association?] Presentation [20 of 32]
Part of City of Vancouver fonds
Backhoe digging soil and depositing it into Park Board truck
Slide shows men and trucks in the garden.
Gardens - Europe - France : Vaux le Vicomte, moving machine plant
B.C. [Scientific] Instrument Manufacturers
Part of Stuart Thomson fonds
Lipsett Museum [display] at the Vancouver Exhibition
Photograph shows a display case of tools, arrow heads and other artifacts
A.1. Foundry : 1 casting, photograph in two positions
Steelweld Ltd., Main St. : dolleys
Steelweld Ltd., Main St. : dolleys
Forsts Ltd., Hastings St. : gas fireplace
Pumps and Power , Cordova St. : pump
[Man inspecting saw blade at] Pacific Mills [on the] Queen Charlotte Islands
[Axes and a hammer being examined at] Pacific Mills [on the] Queen Charlotte Islands
Richards Engineering - S.K.F. Superior Bearings
AI Steel Foundry, 29 West 3rd Ave.
AI Steel Foundry, 29 West 3rd Ave.
AI Steel Foundry, 29 West 3rd Ave. - castings
Verite: manufacture at old asphalt plant
Verite: manufacture at old asphalt plant
Verite: hoisting into building
Verite: manufacture at old asphalt plant
Centrifugal No. 8 - broken coupling between drive motor and centr[al?] basket shaft
Damage done during collapse of No. 2 RGS [Rogers Golden Syrup] & invert tank
Vertite station construction - rigging for placing vessels
New cube press in machine shop - front view
Centrifugal No. 8 - broken coupling between drive motor and centr[al?] basket shaft
Damage to reduction gear "E" pan stirrer
Sugar conditioning - silos - handling equipment
Sugar conditioning - silos - handling equipment
Sugar conditioning - silos - handling equipment
Powerhouse equipment at time of completion: feed pumps, 100 hp - 3600 rpm
Western States Refined centrifugal
Powerhouse equipment at time of completion: turbine governor, desuperheating control panel