Roofing on main building proceeding; pouring 6th lift sugar end
- AM1592-S8-2-F03-: 2011-092.7033
- Item
- Aug. 31, 1949
Roofing on main building proceeding; pouring 6th lift sugar end
East elevation of factory, placing distributor head on lime kiln
Piping under carbonation tanks
Pulp dryer furnace brick work proceeding
Lime house steel nearing completion
Looking south from bulk storage tower showing main building & sugar end cupola roofing
Domestic water filtration plant in powerhouse
First floor wall partitions ready for plastering
Cutter floor showing motor bases in place, conduit being installed and reinforcing in place
Crystallizers showing platform & stairway under construction
Sulphur bin and pattern platform steel
Completion of main building structural steel as viewed from north side of sugar warehouse
View of boiler house showing intercampaign boiler #1 & #2
Looking south at second floor main building from pan floor
View from power house showing heating boiler on its supporting frame
Boiler, dressing tube ends in foreground
Pouring limerock unloading ramp
Boiler # 2 showing tack tubes in place
Laying pulp warehouse drain line & forming limerock ramp
West elevation of factory showing third lift shows stripped last lift being formed
Looking northwest from main building at forming for first floor office building
Gas piping for 1st & 2nd carbonation stations
Ground floor syrup storage tanks with melter tanks, #2 elevator pit
Scrolls from plate & frame hoppers to sludge tank
Second floor beet end looking south west showing Oliver ventilating ducts
Pouring first lift of office building walls
Looking north-west showing forming for 1st floor walls of office
Management, supervisors and office staff pictured in front of bins
Item is a photograph that includes the following staff: (left to right) R. Evanson, Fieldman; W. Smith, Field Supt.; R. Gibb, Engineering Dept.; J. Miller, Construction Eng.; T. George Wood, General Manager; E. Price, Construction Supt.; F.R. Taylor, Assistant General Manager; F.H. Ballou, Chief Eng.; J. Landysheff, Chief Chemist; F.H. Turner, Office Supervisor; V. Johnson, Stenographer; B. Rolfson, Chief Electr.; E. Meyer, Timekeeper; L. Erickson, Storekeeper.
Waste water pumphouse and start of sheet pile driving
Second life of Sugar Warehouse Walls
Pouring north foundation wall of Pulp Warehouse
Seond Life Forms on Machine Shop with Pulp Drier and Pulp Warehouse in Background
Completing wall pour on Intake House
Pouring soaking hopper. Wet hopper on right
Looking southeast from top of bins, showing chimney erection and formwork on walls of pulp warehouse
Finishing touches being put on chimney
Excavation for foundations of packing house from top of sugar warehouse
Pouring west end third lift of pulp warehouse
Setting the form for conveyor pit #4 in pulp drier building
Looking north at forming for foundation walls of waste water pumphouse