Pacific Centre [construction] progress
- COV-S511---: CVA 780-36
- Item
- July [19]69
Part of City of Vancouver fonds
4162 results with digital objects Show results with digital objects
Pacific Centre [construction] progress
Part of City of Vancouver fonds
Pacific Centre [construction progress]
Part of City of Vancouver fonds
Apartment Report [- apartment buildings in Kerrisdale]
Part of City of Vancouver fonds
Photograph also shows the construction of an apartment building
Pouring new sidewalk in the 500 block Pender [East Pender and Jackson Streets]
Part of City of Vancouver fonds
Photograph also shows houses and buildings including the dome of the Sun Tower (100 West Pender Street)
Howe and Robson [Streets looking] west
Part of City of Vancouver fonds
500 West Hastings Street north side
Part of City of Vancouver fonds
Images show barricaded construction site (with upper portion of CN Station in background).
700 West Pender Street south side
Part of City of Vancouver fonds
Image shows a large construction site.
[Building in the] 700 [block] Thurlow Street west side [at Alberni Street under construction]
Part of City of Vancouver fonds
Image shows a parkade under construction.
Part of City of Vancouver fonds
Waterfront Viaduct Construction [2 of 11]
Part of City of Vancouver fonds
Photograph shows the Canadian Pacific Railway Station.
Waterfront Viaduct Construction [4 of 11]
Part of City of Vancouver fonds
Photograph shows a view looking east on Cordova Street, the Canadian Pacific Railway Station and the Woodward's tower.
Waterfront Viaduct Construction [8 of 11]
Part of City of Vancouver fonds
Part of Major Matthews collection
Construction progress photograph. Photograph shows the Alcazar Hotel, the "W" on the roof of the Woodwards building and the Sun Tower.
[The new Post Office building site looking towards Georgia between Hamilton and Homer Streets]
Part of Major Matthews collection
Construction progress photograph
[The new Post office building under construction from Dunsmuir and Hamilton Streets]
Part of Major Matthews collection
Construction progress photograph
[The new Post Office building under construction from the corner of Homer and Georgia Street]
Part of Major Matthews collection
Construction progress photograph. Photograph shows the "W" on the roof of the Woodward's building and the Sun Tower.
[The Richmond Hotel under construction]
Part of Major Matthews collection
[The Vancouver Block under construction - 736 Granville Street]
Part of Major Matthews collection
Photograph shows the foundation of the Birks building under construction, the Dominion Bank building and the Steeple of Holy Rosary Cathedral.
[Three penstocks for Buntzen Lake Power Plant number one]
Part of Major Matthews collection
[Three West End apartment buildings in construction phase]
Part of Major Matthews collection
Photograph shows three apartment buildings encompassed by Beach Avenue, Bidwell, Harwood and Cardero
[Top of surge tank of hydraulic tunnel for Buntzen Lane Power Plant number two]
Part of Major Matthews collection
[Tracks, carts and horse near partially excavated tunnel for Buntzen Lake Power Plant number one]
Part of Major Matthews collection
[Two men on partially cleared site for Buntzen Lake Power Plant number one]
Part of Major Matthews collection
Part of Major Matthews collection
[Steel frame of partially constructed Horne Payne substation]
Part of Major Matthews collection
[Partially constructed Horne-Payne substation]
Part of Major Matthews collection
Part of Major Matthews collection
Part of Major Matthews collection
[Partially constructed penstock for Buntzen Lake Power Plant number two]
Part of Major Matthews collection
Photograph shows railway track and pipe leading up hill.
[Partially constructed penstocks for Buntzen Lake Power Plant number two]
Part of Major Matthews collection
Photograph shows three sections of pipe leading up hill.
[Partially constructed penstocks for Buntzen Lake Power Plant number two]
Part of Major Matthews collection
Photograph shows men on the partially assembled pipes, including (left to right, sitting on scaffolding): F.S. Easton, Hydraulic Engineer for the B.C. Electric Railway Co., and Martin Tracey, Resident Engineer of the Buntzen Lake Power Plant.
[Partially constructed Seaforth Armories on Burrard Street near south end of Burrard Street Bridge]
Part of Major Matthews collection
J.S. Matthews' notes with print or negative in Archives.
[Partially constructed Seaforth Armoury on Burrard Street at south end of Burrard Street Bridge]
Part of Major Matthews collection
J.S. Matthews' notes with print or negative in Archives.
[Partially contructed Jordan River Power Plant, showing north end of Amburson type concrete dam]
Part of Major Matthews collection
[Pipes and rocks in partially excavated area of Coquitlam Dam construction site]
Part of Major Matthews collection
[Portion of roof garden of second Hotel Vancouver under construction]
Part of Major Matthews collection
[View of the first Capilano Creek dam under construction]
Part of Major Matthews collection
Part of Major Matthews collection
Part of Major Matthews collection
Photograph shows a carbon electric light
[Westcoast Building under construction - 1333 West Georgia Street]
Part of Major Matthews collection
Photograph shows the central concrete core illuminated at night
[Wooden penstock for Buntzen Lake Power Plant number one]
Part of Major Matthews collection
Part of Major Matthews collection
Photograph shows the Donald A. Smith (Strathcona) building under construction and the first Hotel Vancouver
B.C. Electric [Hydro Building - 970 Burrard Street under construction]
Part of Major Matthews collection
Photograph shows the Hotel Vancouver
[Two penstocks for Buntzen Lake Power Plant number one]
Part of Major Matthews collection
[Vancouver Art Gallery under construction - 1145 W. Georgia Street]
Part of Major Matthews collection
[Vancouver General Hospital Maternity Ward under construction]
Part of Major Matthews collection
Construction progress photograph.
[Various scenes regarding the activities of the B.C. Electric Railway Company]
Part of Major Matthews collection
Photograph negative is a copy of three photograph prints, showing: men standing next to railway tracks in partially excavated tunnel; man standing next to monitor releasing water into cleared area; and men standing with tools in partially excavated tunnel. Negative was created to produce lantern slides of the four images.
[Various scenes regarding the construction of the Coquitlam Dam]
Part of Major Matthews collection
Photograph negative is a copy of five photograph prints, showing: water cresting over the top of the Coquitlam Dam; the clearing of the Coquitlam Dam site with a donkey engine; the roots of a large tree cleared off the Coquitlam Dam site; bridge over Coquitlam Dam; and two men sawing tree stump at Coquitlam Dam site. Negative was created to produce lantern slides of the five images.
[Various views of Buntzen Lake Power Plant]
Part of Major Matthews collection
Photograph negative is a copy of four photograph prints showing: power plant number two viewed from Indian Arm; partially constructed high voltage switch room of power plant number two; partially constructed interior generator room of power plant number two; and power plant number one viewed from Indian Arm. Negative was created to produce lantern slides of the four images.
[View of Coquitlam Lake and Coquitlam Dam construction camp]
Part of Major Matthews collection