Ozama weekly reviews: April 1953
- AM1592-S8-1-F65
- File
- Apr. 1953
4612 results with digital objects Show results with digital objects
Ozama weekly reviews: April 1953
Ozama bi-weekly reviews: August & September 1953
File consists of weekly crop, harvest and sugar production reviews sent to the BC Sugar Engineering Department.
Ozama weekly reviews: May 1954
Ozama weekly reviews: March 1955
File consists of a listing of all costs associated with the set-up and operation of the Ozama plantation other than raw sugar. The list appears to have been drawn up in 1955 and may have been created during the process of selling the firm.
File consists of data sheets on the various pieces of machinery in use at the Ozama mill. The sheets include information on whether or not the company has drawings, purchase order, its purpose, who manufactured the equipment, location, technical descripti
Ozama weekly reviews: January 1948
Ozama weekly reviews: January 1950
Taber refinery site photographs
File consists of photographs of the site of the future Taber sugar beet refinery and the vicinity of the site, including photographs of the Old Man River.
Bulk raw sugar bin - May, 1949
Construction photograph [Taber, Alberta refinery?]
Looking due east towards site from road west of site
F.H.B. [Frank H. Ballou?], L.R.P. and Wes Smith standing on site
Refinery equipment - centrifugals
Looking east showing erection of Dorr tank and structural steel
Footings for walls of generator
Forms for foundation wall of gas reducing station
Pouring slab of Dorr Tank foundation
Rolling pulp drier drum off flatcar
Pulp dryer in place on trunnion, structural steel being completed
General view of beet pumphouse & main flume
Frost fence and wet hopper superstructure
General view of boiler & power house area showing commencement of structural steel erection
Rivetting & welding boiler & power house structural steel
Looking north in basement of bin #2 showing discharge of chutes, lump crusher & heating system ducts
Beet end showing addition of the first two carbonation tanks and one Oliver filter
Beet end showing addition of one truss and foam stacks to carbonation tank
Moving third section of building #9 into position
Looking southeast from top of pulp warehouse
Beet pumphouse foundation wall forms nearing completion
Assembling #3 flume, looking west towards tailflume
#1 flume and tailflume forms looking south from top of pulp warehouse
Setting screeds and grading floor preparatory to placeing concrete floors in pulp warehouse
Packing house foundation walls being backfilled
Filling railway grade for Tracks 1, 2 &3 east of the wet hopper
Pulp drier steel being rivetted
Erecting truck bin storage tank at west end of pulp warehouse
Waste water pumphouse from the southwest
Excavating and laying tile at outfall end of waste water line looking southeast
Grading piling area in background and tamping backfill on #2 flume in foreground
Finishing subgrade and setting screeds for pulp drier floor
Looking east from top of pulp warehouse