Columbia [Street] and 4th [Street] east side incoming
Kingsway and Princess [Street] south side city incoming
Crib, Pier No. 5
General View
Cutting Edge Pier No. 4
General View Looking South
General View Looking South
General View
Fleet Laid Up During High Water
Superstructure South Shore
General View from North Side
Laying Stone in Coffer-Dam
[Men standing on the front of a locomotive on the bridge]
[A crowd gathers to watch a span of the bridge being floated into place]
Floating One Half of Spread Span
[A span being floated into place]
[A span ready for floating]
Spread Span Floating
[A crowd watches as a spread span is floated into place]
[A spread span is floated into position]
[A Vancouver, Westminster and Yukon Railway Company train crosses the bridge]
[A view of the completed bridge]
Sinking Crib Pier 9
Crib, Pier No. 9
Dredging Pier 11
Inside Crib Pier 10
General View from North Side
Crib, Pier No. 5
Crib, Pier No. 6
[Consulting Engineers and Contractors for Substructure of the Fraser River Bridge]
Cutting Edge Pier 4
Sinking Pivot Pier
Sinking Pivot Pier
General View Looking South
General View Looking South
Land Pile Driver
General View Looking South
[Two men building a pier]
Center Line, South Shore
Dredging Pier No. 3
Removing Log [from] Pier No.3
[Engineers and contractors at the bridge site]
[Engineers in front of the Office of the Resident Engineer]
Fleet Laid Up During High Water
Masonry, Pier No.4
View Looking South
Dredging Pier No. 2
General View from South Shore
General View from North Shore
Pier No. 3