- AM1592-S8-4-F01-: 2011-092.5136
- Item
- June 15, 1935
Showing 1911 results
Archival descriptionFinished excavation for bins, gravel bunkers, cement shed
- AM1592-S8-4-F01-: 2011-092.5135
- Item
- June 15, 1935
Foundations for houses on lots 2,4,6, and 8 with no. 8 in foreground
- AM1592-S8-4-F01-: 2011-092.5134
- Item
- June 15, 1935
- AM1592-S8-4-F01-: 2011-092.5133
- Item
- June 8, 1935
Construction site, including pile driver
- AM1592-S8-4-F01-: 2011-092.5132
- Item
- June 8, 1935
Temporary office, store-house, ground test, pile driver in position
- AM1592-S8-4-F01-: 2011-092.5131
- Item
- June 3, 1935
Temporary office, store-house, ground test, pile driver in position
- AM1592-S8-4-F01-: 2011-092.5130
- Item
- June 3, 1935
- AM1592-S8-4-F01-: 2011-092.5129
- Item
- June 2, 1935
Bunk house, cook house and temporary houses showing west road leading to factory
- AM1592-S8-4-F01-: 2011-092.5128
- Item
- June 2, 1935
Camp showing trench for water service
- AM1592-S8-4-F01-: 2011-092.5127
- Item
- May 27, 1935
- AM1592-S8-4-F01-: 2011-092.5126
- Item
- May 27, 1935
Pile driver tool shed and commencement of administration building
- AM1592-S8-4-F01-: 2011-092.5125
- Item
- May 18, 1935
- AM1592-S8-4-F01-: 2011-092.5124
- Item
- May 18, 1935
Commencing operations Picture Butte [men and cars in field]
- AM1592-S8-4-F01-: 2011-092.5123
- Item
- May 13, 1935
- AM1592-S8-4-F01-: 2011-092.5122
- Item
- Apr. 19, 1935
Postcard of Picture Butte site construction
- AM1592-S8-4-F01-: 2011-092.5121
- Item
- Sep. 1, 1935
Construction photograph [Taber, Alberta refinery?]
- AM1592-S8-2-F07-: 2011-092.2307
- Item
- [July 13, 1948?]
Piping and control valves on evaporators and pan condensers
- AM1592-S8-2-F03-: 2011-092.7100
- Item
- Feb. 15, 1950
- AM1592-S8-2-F03-: 2011-092.7099
- Item
- Feb. 15, 1950
- AM1592-S8-2-F03-: 2011-092.7098
- Item
- Feb. 15, 1950
Piping in powerhouse & boilerroom
- AM1592-S8-2-F03-: 2011-092.7097
- Item
- Feb. 1, 1950
- AM1592-S8-2-F03-: 2011-092.7096
- Item
- Feb. 1, 1950
Pulp dryer furnace with the burners in place.
- AM1592-S8-2-F03-: 2011-092.7095
- Item
- Feb. 1, 1950
Steam traps & piping at hot water collecting tanks
- AM1592-S8-2-F03-: 2011-092.7094
- Item
- Feb. 1, 1950
Piping on control valves on juice heaters
- AM1592-S8-2-F03-: 2011-092.7093
- Item
- Jan. 18, 1950
- AM1592-S8-2-F03-: 2011-092.7092
- Item
- Jan. 18, 1950
Installing relief valves on exhaust lines at deaerator
- AM1592-S8-2-F03-: 2011-092.7091
- Item
- Jan. 18, 1950
Spray pipes, ammonia lines and sight glasses installed on pans
- AM1592-S8-2-F03-: 2011-092.7090
- Item
- Jan. 18, 1950
Control valves on evaperators and pan condensers
- AM1592-S8-2-F03-: 2011-092.7089
- Item
- Jan. 4, 1950
Hot and cold air fans and precipitron housing
- AM1592-S8-2-F03-: 2011-092.7088
- Item
- Jan. 4, 1950
- AM1592-S8-2-F03-: 2011-092.7087
- Item
- Jan. 4, 1950
Hot water tank with gas heater and hot water heating system controls in the office basement
- AM1592-S8-2-F03-: 2011-092.7086
- Item
- Dec. 21, 1949
- AM1592-S8-2-F03-: 2011-092.7085
- Item
- Dec. 21, 1949
Oliver and pan vacuum pumps in place
- AM1592-S8-2-F03-: 2011-092.7084
- Item
- Dec. 21, 1949
Turbine exhaust piping at deaerator
- AM1592-S8-2-F03-: 2011-092.7083
- Item
- Dec. 21, 1949
Lime house showing outside lime rock and coke hoist tower
- AM1592-S8-2-F03-: 2011-092.7082
- Item
- Dec. 7, 1949
Installation of switch board switch gear on battery
- AM1592-S8-2-F03-: 2011-092.7081
- Item
- Dec. 7, 1949
Pan condenser piping on the 4th floor
- AM1592-S8-2-F03-: 2011-092.7080
- Item
- Dec. 7, 1949
Garage and carpenters shack removed [exterior elevation of factory and bins]
- AM1592-S8-2-F03-: 2011-092.7079
- Item
- Nov. 23, 1949
Domestic water filtration plant in powerhouse
- AM1592-S8-2-F03-: 2011-092.7078
- Item
- Nov. 23, 1949
Installing 16" diametre transite line in main building
- AM1592-S8-2-F03-: 2011-092.7077
- Item
- Nov. 23, 1949
- AM1592-S8-2-F03-: 2011-092.7076
- Item
- Nov. 23, 1949
- AM1592-S8-2-F03-: 2011-092.7075
- Item
- Nov. 23, 1949
Installing pipe lines & pump motors in molasses pump house
- AM1592-S8-2-F03-: 2011-092.7074
- Item
- Nov. 23, 1949
Lime house showing the concret slab
- AM1592-S8-2-F03-: 2011-092.7073
- Item
- Nov. 9, 1949
Placing floor reinforcing under the granulator at col. 125 - 225 - 228 - 128 bay
- AM1592-S8-2-F03-: 2011-092.7072
- Item
- Nov. 9, 1949
Powerhouse switch board in place
- AM1592-S8-2-F03-: 2011-092.7071
- Item
- Nov. 9, 1949
Molasses pump house finishing room
- AM1592-S8-2-F03-: 2011-092.7070
- Item
- Nov. 9, 1949
Installing rock catcher in beet pumphouse
- AM1592-S8-2-F03-: 2011-092.7069
- Item
- Nov. 9, 1949
Installation of catchall & condenser piping at the pan floor
- AM1592-S8-2-F03-: 2011-092.7068
- Item
- Nov. 9, 1949