Completion of main building structural steel as viewed from north side of sugar warehouse
- AM1592-S8-2-F03-: 2011-092.6974
- Item
- June 22, 1949
Completion of main building structural steel as viewed from north side of sugar warehouse
Placing reinforcing steel & plumbing sleeves for first floor of office building
Erecting structural steel for #1 boiler in foreground
Pouring limerock unloading ramp
View from second floor main building showing vapour piping to pans
Sugar end steel showing Rotex screen on fifth floor
Looking northwest from main building at forming for first floor office building
Forms for office building foundation walls
West elevation of factory showing third lift shows stripped last lift being formed
Laying pulp warehouse drain line & forming limerock ramp
Boiler # 2 showing tack tubes in place
Packing house structural steel & granulator
Area to south of pulp warehouse, showing completion of water & sewer lines
Exvacation for molasses tanks & Pumphouse at rear of boiler house
Pouring valve box at main water pumphouse
Sugar end showing main & hot water tanks on fifth floor
Boiler, dressing tube ends in foreground
View from power house showing heating boiler on its supporting frame
Looking east in monitor of pulp warehouse showing conveyor #10, lighting
Office building showing vault form in centre
General view of second floor showing third lift wall forms under construction
Limerock unloading ramp forms; excavating for sewer
Interior view of beet end wall forms showing arrangement of scaffolding
Sugar end steel from top of bulk storage
South elevation of pulp drier & main building
Pouring anchor blocks on wet hopper water line, laying tile for pulp warehouse roof drains
Forms for office foundation walls
Forms for limerock unloading ramp in foregraound & installing windows in boiler house
Front view of factory showing fourth lift forms on beet end walls and second lift stripped
Forming office building foundation walls
Interior of boiler house showing foundations of No. 1 & inter-campaign boiler
View of second floor from behind sulphur tower showing assembly of standard liquor heaters
General view from top of bulk storage showing transite completed
West elevator from factory site gate
Looking east at beet end of main building showing first lift stripped and third lift being erected
Sugar end showing addition of "B" pan
General view of power & boiler house showing transite on roof of boiler house
South side of pulp warehouse showing excavation & backfilling of trenches for roof drains
Looking south along beet flume water line at value for No. 2 flume
Looking west from top of the pulp warehouse
Looking northwest at boiler house & gas reducing station at right
Erecting monitor steel for sugar end of main building
Pouring second lift of main building walls
Overflow pond at waste water pump house
Looking south from west side of machine shop at second & first carbonation station piping
Completing forms for the last lift on the boiler house walls