Chairlift [Mount Seymour, reel 2]
- AM1545-: 2013-020.15
- Item
- [1962 or 1963]
Item is a film showing men making and assembling the machine parts for the Mount Seymour Chair Lift. The parts are packed and a truck transports the materials to Mount Seymour. Description from the B.C. Archives: Construction of the Mount Seymour chair lift, from the fabrication and casting of components at machine shops and foundries, transportation of components to the site, etc. through on-site construction, assembly, testing, opening and actual operation of the lift system during ski season.