#1 flume and tailflume forms looking south from top of pulp warehouse
- AM1592-S8-2-F02-: 2011-092.6770
- Item
- Aug. 25, 1948
538 results with digital objects Show results with digital objects
#1 flume and tailflume forms looking south from top of pulp warehouse
#3 flume excavated and graded, ready to receive flume bents
4th & 5th effect evaporators in place
"A" pan installed & "E" being installed
Administration Building Site Looking West
Air view of factory site, looking northwest
Air view of factory site, looking south
Another section of Building 19
Applying 20 year bonded roof on cupola of Bulk Storage bins
Applying the roofing to the factory garage
Applying waterproofing to generator pit walls and backfilling foundation wall of main building
Area to south of pulp warehouse, showing completion of water & sewer lines
Assembling #3 flume, looking west towards tailflume
Assembling of pit dryer cyclones
Assembling of pulp dryer cyclones
Backfilling and stripping the main flume
Backfilling boiler and power house foundations
Backfilling of power house completed
Beet end juice pumps in place on bases
Beet end showing addition of one truss and foam stacks to carbonation tank
Beet end showing addition of the first two carbonation tanks and one Oliver filter
Beet end showing addition of two trusses, second carbonation tank, one Oliver filter
Beet end showing No. 1 Oliver, Dorr tank, & #3 first carbs tank
Beet end steel erected to date
Beet pumphouse and #1 flume in foreground and tailflume extending south
Beet pumphouse foundation wall forms nearing completion
Beet pumphouse from top of pulp warehouse
Beet wheel and beet washer set on foundations in wash house
Beginning of erection of waste water pumphouse wall forms - looking south
Bin platform showing jacks, rods
Body sections, and catchalls for Taber pans as fabricated in Vancouver Refinery shops
Boiler # 2 showing tack tubes in place
Boiler #1 & #2, showing baffle tile in #2
Boiler foundation being stripped and backfilled
Boiler foundation forms being completed
Boiler house structural steel complete
Boiler house structural steel with 1st forms in place
Boiler, dressing tube ends in foreground
Bottom core and charge ring for Taber pans fabricated in refinery plate shop, Vancouver
Bottom of Dorr tank on location and welded