- AM1257-S25-: CVA 275-33
- Item
Showing 9 results
Archival description- AM1257-S25-: CVA 275-20
- Item
Planned hotel overlooking Capilano Canyon
- AM1257-S25-: CVA 275-19
- Item
60 inch to 90 inch Y. at Seymour Falls Dam construction site
- AM1257-S25-: CVA 1153-6
- Item
- Sep. 17, 1959
Two 78 inch diameter conduits being prepared for concrete encasement for Seymour Falls Dam
- AM1257-S25-: CVA 1153-5
- Item
- Sep. 17, 1959
View of construction of Seymour Falls Dam looking north between buttresses 11 to 14
- AM1257-S25-: CVA 1153-4
- Item
- Aug. 20, 1959
Photograph shows intake structure located between buttresses 12 and 13; and buttress 11 and 14 have been completed to E1 765.5 and buttresses 12 and 13 have been completed to E1 741.5 feet.
View from axis of old Seymour Falls Dam showing intake structure and form work for transitions
- AM1257-S25-: CVA 1153-3
- Item
- June 5, 1959
- AM1257-S25-: CVA 1153-2
- Item
- Apr. 6, 1959
Photograph shows part of west diversion breach on extreme left. Formwork is cut off wall between buttresses 9 and 10 to between buttress 10 and 11. In left background is part of 60 inch main from temporary pumping station.
General view of Seymour Falls Dam construction of the looking east from old screen room
- AM1257-S25-: CVA 1153-1
- Item
- May 27, 1959