- AM1592-1-S1-F13-: 2011-092.0041
- Item
- 1950
Showing 601 results
Archival description587 results with digital objects Show results with digital objects
Management, supervisors and office staff pictured in front of bins
- AM1592-S8-2-F01-: 2011-092.6554
- Item
- Feb. 26, 1948
Item is a photograph that includes the following staff: (left to right) R. Evanson, Fieldman; W. Smith, Field Supt.; R. Gibb, Engineering Dept.; J. Miller, Construction Eng.; T. George Wood, General Manager; E. Price, Construction Supt.; F.R. Taylor, Assistant General Manager; F.H. Ballou, Chief Eng.; J. Landysheff, Chief Chemist; F.H. Turner, Office Supervisor; V. Johnson, Stenographer; B. Rolfson, Chief Electr.; E. Meyer, Timekeeper; L. Erickson, Storekeeper.
- AM1592-S8-2-: 2011-092.7181
- Item
- 1986
- AM1592-S8-2-: 2011-092.7180
- Item
- 1986
Piping and control valves on evaporators and pan condensers
- AM1592-S8-2-F03-: 2011-092.7100
- Item
- Feb. 15, 1950
- AM1592-S8-2-F03-: 2011-092.7099
- Item
- Feb. 15, 1950
- AM1592-S8-2-F03-: 2011-092.7098
- Item
- Feb. 15, 1950
Piping in powerhouse & boilerroom
- AM1592-S8-2-F03-: 2011-092.7097
- Item
- Feb. 1, 1950
- AM1592-S8-2-F03-: 2011-092.7096
- Item
- Feb. 1, 1950
Pulp dryer furnace with the burners in place.
- AM1592-S8-2-F03-: 2011-092.7095
- Item
- Feb. 1, 1950
Steam traps & piping at hot water collecting tanks
- AM1592-S8-2-F03-: 2011-092.7094
- Item
- Feb. 1, 1950
Piping on control valves on juice heaters
- AM1592-S8-2-F03-: 2011-092.7093
- Item
- Jan. 18, 1950
- AM1592-S8-2-F03-: 2011-092.7092
- Item
- Jan. 18, 1950
Installing relief valves on exhaust lines at deaerator
- AM1592-S8-2-F03-: 2011-092.7091
- Item
- Jan. 18, 1950
Spray pipes, ammonia lines and sight glasses installed on pans
- AM1592-S8-2-F03-: 2011-092.7090
- Item
- Jan. 18, 1950
Control valves on evaperators and pan condensers
- AM1592-S8-2-F03-: 2011-092.7089
- Item
- Jan. 4, 1950
Hot and cold air fans and precipitron housing
- AM1592-S8-2-F03-: 2011-092.7088
- Item
- Jan. 4, 1950
- AM1592-S8-2-F03-: 2011-092.7087
- Item
- Jan. 4, 1950
Hot water tank with gas heater and hot water heating system controls in the office basement
- AM1592-S8-2-F03-: 2011-092.7086
- Item
- Dec. 21, 1949
- AM1592-S8-2-F03-: 2011-092.7085
- Item
- Dec. 21, 1949
Oliver and pan vacuum pumps in place
- AM1592-S8-2-F03-: 2011-092.7084
- Item
- Dec. 21, 1949
Turbine exhaust piping at deaerator
- AM1592-S8-2-F03-: 2011-092.7083
- Item
- Dec. 21, 1949
Lime house showing outside lime rock and coke hoist tower
- AM1592-S8-2-F03-: 2011-092.7082
- Item
- Dec. 7, 1949
Installation of switch board switch gear on battery
- AM1592-S8-2-F03-: 2011-092.7081
- Item
- Dec. 7, 1949
Pan condenser piping on the 4th floor
- AM1592-S8-2-F03-: 2011-092.7080
- Item
- Dec. 7, 1949
Garage and carpenters shack removed [exterior elevation of factory and bins]
- AM1592-S8-2-F03-: 2011-092.7079
- Item
- Nov. 23, 1949
Domestic water filtration plant in powerhouse
- AM1592-S8-2-F03-: 2011-092.7078
- Item
- Nov. 23, 1949
Installing 16" diametre transite line in main building
- AM1592-S8-2-F03-: 2011-092.7077
- Item
- Nov. 23, 1949
- AM1592-S8-2-F03-: 2011-092.7076
- Item
- Nov. 23, 1949
- AM1592-S8-2-F03-: 2011-092.7075
- Item
- Nov. 23, 1949
Installing pipe lines & pump motors in molasses pump house
- AM1592-S8-2-F03-: 2011-092.7074
- Item
- Nov. 23, 1949
Lime house showing the concret slab
- AM1592-S8-2-F03-: 2011-092.7073
- Item
- Nov. 9, 1949
Placing floor reinforcing under the granulator at col. 125 - 225 - 228 - 128 bay
- AM1592-S8-2-F03-: 2011-092.7072
- Item
- Nov. 9, 1949
Powerhouse switch board in place
- AM1592-S8-2-F03-: 2011-092.7071
- Item
- Nov. 9, 1949
Molasses pump house finishing room
- AM1592-S8-2-F03-: 2011-092.7070
- Item
- Nov. 9, 1949
Installing rock catcher in beet pumphouse
- AM1592-S8-2-F03-: 2011-092.7069
- Item
- Nov. 9, 1949
Installation of catchall & condenser piping at the pan floor
- AM1592-S8-2-F03-: 2011-092.7068
- Item
- Nov. 9, 1949
Main building showing scaffolding removed
- AM1592-S8-2-F03-: 2011-092.7067
- Item
- Oct. 26, 1949
Interior view gas reducing station
- AM1592-S8-2-F03-: 2011-092.7066
- Item
- Oct. 26, 1949
Front view of intercampaign heating boiler
- AM1592-S8-2-F03-: 2011-092.7065
- Item
- Oct. 26, 1949
Finishing topping on cutter floor
- AM1592-S8-2-F03-: 2011-092.7064
- Item
- Oct. 26, 1949
Sulphur bin and pattern platform steel
- AM1592-S8-2-F03-: 2011-092.7063
- Item
- Oct. 19, 1949
Crystallizers showing platform & stairway under construction
- AM1592-S8-2-F03-: 2011-092.7062
- Item
- Oct. 19, 1949
Picking table floor showing picking table under construction
- AM1592-S8-2-F03-: 2011-092.7061
- Item
- Oct. 19, 1949
Cutter floor showing motor bases in place, conduit being installed and reinforcing in place
- AM1592-S8-2-F03-: 2011-092.7060
- Item
- Oct. 19, 1949
First floor wall partitions ready for plastering
- AM1592-S8-2-F03-: 2011-092.7059
- Item
- Oct. 14, 1949
- AM1592-S8-2-F03-: 2011-092.7058
- Item
- Oct. 14, 1949
Canopy steel erected and rivetting about completed
- AM1592-S8-2-F03-: 2011-092.7057
- Item
- Oct. 14, 1949
Looking east at rear of the heating and main boilers
- AM1592-S8-2-F03-: 2011-092.7056
- Item
- Oct. 5, 1949
Laying vermiculite on the west end of sugar warehouse
- AM1592-S8-2-F03-: 2011-092.7055
- Item
- Oct. 5, 1949