Installing fixtures in storeroom
- AM1592-S8-2-F01-: 2011-092.6586
- Item
- June 9, 1948
Installing fixtures in storeroom
Pouring Vermiculite fill on roof of Sugar Warehouse
Erecting pulp warehouse steel looking southwest
View from machine shop showing west wall stripped and backfilled
Setting up forms and mixing plant preparatory to raising the chimney
Reinforcing in place for slab of reservoir at waste water pumphouse
General view showing first & second lift forming of pump warehouse walls, chimney in foreground
Bulk Storage Excavation looking Southwest
Bulk Storage - Pouring foundation on to slabs
Placing concrete in Bin #1 of the Bulk Storage slab
Reinforcing steel-placing concrete in bulk storage
The Site, looking N.E. along Track 9
Bulk Storage Excavation from Cement Shed
Completed Bulk Storage Slab - Looking North
Looking N.E. toward Intake House & Reservoir
Reinforcing steel-placing concrete in bulk storage
Hoisting arrangement, with heating boiler on right
Erection of Forms for Bin Basement
Erecting Forms for Basement Walls of Bulk Storage
Pouring Bin Floor Slab on #4 Bin
Dragline - Digging Intake Ditch for Main Water Line (looking North-East)
Bulk Storage Bins showing Basement wall forming
Erecting the East end of the Sugar warehouse steel
Pouring Machine Shop footings Looking West
Structural steel to 06 column line forming Dorr Tank foundation
General view of factory from scale house road
Diesel oil tank storage erected at left and completed
Backfilling and stripping the main flume
Completing foundation wall forms between columns
Bottom of Dorr tank on location and welded
Looking at carbonation station from beet end
Second floor, setting plate & frame presses & welding Dorr tank
Beet end showing addition of two trusses, second carbonation tank, one Oliver filter
Looking north in cupola of bulk storage bins
Beet end showing No. 1 Oliver, Dorr tank, & #3 first carbs tank
Assembling of pit dryer cyclones
Looking north at factory garage
Completion of pulp drier structural steel
Welding top cover of Dorr tank
Laying brick at east end of pulp warehouse
View of tailflume from pulp warehouse showing forms for #2 flume junction in place
Junction of #3 and tailflume - looking east along #3
Rivetting the wet hopper superstructure