1st and 2nd evaporators in place
1st smoke stack being set in place
#3 [number three] track produced into trash house for erection of beet end steel
4th [fourth] crystallizer being set in place
Administration building
Air conditioning system, bulk storage head house
Arrival of 1st first cold boiling tank
Battery foundations
Beet end structural steel
Beet flumes under construction
Beet slicer
Beet storage flumes
Beet storage water line and wet hopper pump house
Beet washer drive and beet wheel
Bin walls & bin bottom
Boiler and flume in boiler house
Boiler foundations
Boiler house
Boiler house
Boiler house and power house brickwork
Boiler house brickwork
Boiler house brickwork
Boiler house brickwork
Boiler house foundations
Boiler house siding and power house roof
Boiler house steel and 3rd evaporator
Bottom slab of bulk storage from tower
Brickwork
Brickwork - main building
Brickwork - packing station and sugar end
Brickwork - progress on sugar end and packing station
Brickwork & roofing progress, main building
Bulk storage bins
Bulk storage with moving form in place. Steel in place for sugar warehouse
Bunk house & cook house
Bunk house, cook house and temporary houses showing west road leading to factory
Camp showing trench for water service
Cement elevator tower, bulk storage
Choosing the site
Clearing out entrance to intake
Commencing operations Picture Butte [men and cars in field]
Construction camp
Construction site, including pile driver
Crew [group photograph of construction site workers]
Dam for factory reservoir
Diffusion battery in place
Dorr tank
Dorr tank
Elliott compressor
Elliott compressor