Installing transite siding on wet hopper superstructure
- AM1592-S8-2-F02-: 2011-092.6924
- Item
- Apr. 27, 1949
Installing transite siding on wet hopper superstructure
"A" pan installed & "E" being installed
North elevation of pulp drier building showing completed window installation
South elevation of power and boiler house walls showing completed power house walls
Third lift wall forms being erected for power and boiler house
Installing glass blocks in north wall of pulp drier building
Forming third lift walls on power & boiler house
Substation at waste water pumphouse
Excavating for water line to beet flumes
Main building steel from bulk storage bins
Second lift walls nearing completion - boiler house
Pulp drier walls from the south
Pulp drier building, 1st lift form stripped
Boiler house structural steel with 1st forms in place
Boiler house structural steel complete
General view front of plant - looking east
Main building structural steel from bulk storage
Pouring first lift of power & boiler house walls
Forming third lift of pulp drier bluiding nearing completion
Looking west along track 6 at factory site
Second carbonation foam header & stacks in place
Looking north at start of third lift for pulp drier building wall
Wet hopper superstructure showing spray piping & stairs
First lift forms for power house walls
Erecting first lift wall forms for power house
First lift wall forms for beet end
Welding evatorators, erecting catwalk, digging trench along power house foundation
Completed form for second wall lift of pulp drier building
Pulp drier building showing molasses tanks
Waste waer pump installation looking north
Looking north in basement of bin #2 showing discharge of chutes, lump crusher & heating system ducts
Looking north in cupola of bulk storage bins
Main building structural steel from top of bins
Dorr tank erection nearly completed
4th & 5th effect evaporators in place
Rivetting & welding boiler & power house structural steel
Erecting discharge housing for pulp drier drum
Truss immediately after dropping
Structural steel erected to date
Second floor, setting plate & frame presses & welding Dorr tank
Looking at carbonation station from beet end
General view of boiler & power house area showing commencement of structural steel erection