Beet pumphouse from top of pulp warehouse
- AM1592-S8-2-F02-: 2011-092.6819
- Item
- Oct. 27, 1948
Beet pumphouse from top of pulp warehouse
Grading piling area at west end
The boiler foundations from the top of the machine shop
Boiler foundation forms being completed
Equipment garage being erected
Looking southwest from top of pulp warehouse
Main flume from beet pumphouse on left to main building at right
Backfilling and stripping the main flume
Rivetting the wet hopper superstructure
Pulp warehouse from the southeast
Boiler foundation being stripped and backfilled
Frost fence & piling ground from east end of #3 flume
General view of beet pumphouse & main flume
Forming foundation wall between power house & main building
General view of waste water lines from builk storage bins
Completing foundation wall forms between columns
Frost fence and wet hopper superstructure
Bottom core and charge ring for Taber pans fabricated in refinery plate shop, Vancouver
Calandrias for Taber pans in refinery plate shop, Vancouver
Calandria with cone bottom in place (Taber pans)
Applying the roofing to the factory garage
Completing turbo-generator foundation and starting generator pit footings
Pouring footings for gas reducing station
Structural steel to 06 column line forming Dorr Tank foundation
General view of factory from scale house road
Footings for walls of generator
Forms for foundation wall of gas reducing station
Outfall of waster water line showing rip rapping & revertment
Looking north from 03 column line at Dorr Tank foundation
Looking north in cupola of bulk storage bins at installation
Pouring slab of Dorr Tank foundation
Rolling pulp drier drum off flatcar
Beet end steel erected to date
Diesel oil tank storage erected at left and completed
Pulp dryer in place on trunnion, structural steel being completed
Bottom of Dorr tank on location and welded
Looking east showing erection of Dorr tank and structural steel
Assembling of pulp dryer cyclones
Pouring generator pit walls and foundation wall between main building and powerhouse
Beet end showing No. 1 Oliver, Dorr tank, & #3 first carbs tank
Powerhouse foundation wall, generator pit and generator foundation
Assembling of pit dryer cyclones
Looking north at factory garage
Second floor steel & Dorr tank fabrication
View of blacksmith shop showing boom extension for Orton crane being fabricated
Placing a cyclone in the pulp dryer plant
Beet end showing addition of the first two carbonation tanks and one Oliver filter
Applying waterproofing to generator pit walls and backfilling foundation wall of main building
Completion of pulp drier structural steel