Looking west along grade for Tracks 1, 2 & 3
- AM1592-S8-2-F01-: 2011-092.6597
- Item
- June 23, 1948
538 results with digital objects Show results with digital objects
Looking west along grade for Tracks 1, 2 & 3
Looking west along track 6 at factory site
Looking west from top of the pulp warehouse
Main building foundations from Bulk Storage looking south
Main building showing scaffolding removed
Main building steel from bulk storage bins
Main building structural steel from bulk storage
Main building structural steel from top of bins
Main flume from beet pumphouse on left to main building at right
Management, supervisors and office staff pictured in front of bins
Item is a photograph that includes the following staff: (left to right) R. Evanson, Fieldman; W. Smith, Field Supt.; R. Gibb, Engineering Dept.; J. Miller, Construction Eng.; T. George Wood, General Manager; E. Price, Construction Supt.; F.R. Taylor, Assistant General Manager; F.H. Ballou, Chief Eng.; J. Landysheff, Chief Chemist; F.H. Turner, Office Supervisor; V. Johnson, Stenographer; B. Rolfson, Chief Electr.; E. Meyer, Timekeeper; L. Erickson, Storekeeper.
Manhole E being set, and locomotive house footing forms in place across road
Molasses pump house finishing room
Molasses tanks in course of erection
Moving shop tools into Machine Shop
Moving third section of building #9 into position
No. 2 boiler insulation completd on side walls
North elevation of pulp drier building showing completed window installation
Northeast elevation of factory
Office basement showing plumbing and heating piping being installed
Office building showing vault form in centre
Oliver and pan vacuum pumps in place
Outfall of waster water line showing rip rapping & revertment
Overflow pond at waste water pump house
Packing house foundation walls being backfilled
Packing house foundations from top of machine shop
Packing house structural steel & granulator
Pan condenser piping on the 4th floor
Picking table floor showing picking table under construction
Piping and control valves on evaporators and pan condensers
Piping in powerhouse & boilerroom
Piping on control valves on juice heaters
Piping under carbonation tanks
Placing a cyclone in the pulp dryer plant
Placing baffle tile for No. 1 boiler
Placing concrete in Bin #1 of Bulk Storage
Placing concrete in Bin #1 of the Bulk Storage slab