View of blacksmith shop showing boom extension for Orton crane being fabricated
- AM1592-S8-2-F02-: 2011-092.6864
- Item
- Jan. 26, 1949
538 results with digital objects Show results with digital objects
View of blacksmith shop showing boom extension for Orton crane being fabricated
Placing a cyclone in the pulp dryer plant
Beet end showing addition of the first two carbonation tanks and one Oliver filter
Applying waterproofing to generator pit walls and backfilling foundation wall of main building
Completion of pulp drier structural steel
Welding top cover of Dorr tank
Beet end showing addition of one truss and foam stacks to carbonation tank
Backfilling of power house completed
Beet end showing addition of two trusses, second carbonation tank, one Oliver filter
Forming first lift of pulp drier walls
General view of boiler & power house area showing commencement of structural steel erection
Looking at carbonation station from beet end
Second floor, setting plate & frame presses & welding Dorr tank
Structural steel erected to date
Truss immediately after dropping
Erecting discharge housing for pulp drier drum
Rivetting & welding boiler & power house structural steel
4th & 5th effect evaporators in place
Dorr tank erection nearly completed
Main building structural steel from top of bins
Looking north in cupola of bulk storage bins
Looking north in basement of bin #2 showing discharge of chutes, lump crusher & heating system ducts
Waste waer pump installation looking north
Pulp drier building showing molasses tanks
Completed form for second wall lift of pulp drier building
Welding evatorators, erecting catwalk, digging trench along power house foundation
First lift wall forms for beet end
Erecting first lift wall forms for power house
First lift forms for power house walls
Wet hopper superstructure showing spray piping & stairs
Looking north at start of third lift for pulp drier building wall
Second carbonation foam header & stacks in place
Looking west along track 6 at factory site
Forming third lift of pulp drier bluiding nearing completion
Pouring first lift of power & boiler house walls
Main building structural steel from bulk storage
General view front of plant - looking east
Boiler house structural steel complete
Boiler house structural steel with 1st forms in place
Pulp drier building, 1st lift form stripped
Pulp drier walls from the south
Second lift walls nearing completion - boiler house
Main building steel from bulk storage bins