Looking south from bulk storage tower showing main building & sugar end cupola roofing
- AM1592-S8-2-F03-: 2011-092.7024
- Item
- Aug. 17, 1949
Looking south from bulk storage tower showing main building & sugar end cupola roofing
Laying fire brick in No. 2 boiler, superheater tubes on floor
Looking east into pulp dryer with furnace brick being laid
Looking south-west into wash house showing trash catcher under construction
East elevation of factory, placing distributor head on lime kiln
Forming fuel oil tank retaining wall, crated switchgear & boiler breeching
View from north end of power house showing deaerator heater platform
Laying brick for pulp dryer furnace, part of press floor poured
View from bulk storage showing prime coat being applied to vermiculite fill on beet end
Hoisting shell of lime kiln, removing main building scaffolding in background
View of boiler house from power house showing intercampaign boiler being bricked up
Second lift walls of office building being formed
Ground floor syrup storage tanks with melter tanks, #2 elevator pit
View from pulp warehouse showing erection of lime kiln
Installing the reinforcing and conduit for office senond floor slab
Gas piping for 1st & 2nd carbonation stations
Installing circulating tubes in No. 1 boiler
Richardson pulp scale in pulp drier building
Placing baffle tile for No. 1 boiler
Soda tanks on ground floor of main building
Northeast elevation of factory
Pouring first lift of office building walls
Erecting steel & setting forms for foundations in limehouse
Second floor beet end looking south west showing Oliver ventilating ducts
Installation of dry pulp conveyors to penthouse of pulp warehouse
Tubing for No. 2 boiler completed & construction of No. 1 boiler
Looking north-west showing forming for 1st floor walls of office
Looking east from main building showing lime house foundations and second pour of limerock paving
View from east showing building progress with lime house equipment
Lime house foundations & grading limerock slab base
Scrolls from plate & frame hoppers to sludge tank
View from catwalk showing various lines
Item consists of a photograph annotated to indicate: 1) 8" Oliver vacuum line; 2) 6" raw juice line from metre to heater; 3) 12" third vapour to heaters; 4) 16" 1st vapor to A & B pans; 5) 14" 2nd vapor to C, D & E pans.
Installing fans for Oliver vapor exhaust system
Boiler #1 & #2, showing baffle tile in #2
First lift wall forms for office building
West end of sugar warehouse showing completed wall and forms for first lift on 1 & 5 column lines
West elevation of main building
Line house foundations in foreground & limerock slab subgrade being trimmed in background
Looking east from machine shop at foundations for molasses tanks & molasses pumphouse
First floor slab of office building
View of boiler house showing intercampaign boiler #1 & #2
Looking south at second floor main building from pan floor
Pouring third lift at main building from 510 to 521