[Partially cleared site for Horne Payne substation, covered in snow]
- AM54-S4-: LGN 1178
- Item
- [1913?]
Part of Major Matthews collection
J.S. Matthews' notes with print or negative in Archives.
479 results with digital objects Show results with digital objects
[Partially cleared site for Horne Payne substation, covered in snow]
Part of Major Matthews collection
J.S. Matthews' notes with print or negative in Archives.
[Partially cleared site of the Buntzen Lake Power Plant number two, viewed from Indian Arm]
Part of Major Matthews collection
[Partially completed Buntzen Lake Power Plant number two, surrounded by scaffolding]
Part of Major Matthews collection
Part of Major Matthews collection
[Partially constructed B.C. Electric Railway Company streetcar]
Part of Major Matthews collection
[Partially constructed B.C. Electric Railway Company streetcar]
Part of Major Matthews collection
Part of Major Matthews collection
[Partially constructed Buntzen Lake Power Plant number two from Indian Arm]
Part of Major Matthews collection
[Partially constructed Buntzen Lake Power Plant number two from Indian Arm]
Part of Major Matthews collection
[Partially constructed Buntzen Lake Power Plant number two, viewed from Indian Arm]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, looking along centre line of dam site]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, looking east along upstream toe of the dam]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, looking east at edge of tree covered hillside]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, looking northeast toward borrow pit]
Part of Major Matthews collection
[Partially constructed Coquitlam dam, looking west along centre line of dam]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, showing dam area and construction camp]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, showing dam area and construction camp]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, showing dam area and construction camp]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, showing downstream slope of dam]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, showing floor of spillway cut]
Part of Major Matthews collection
Part of Major Matthews collection
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, showing stepped concrete core wall and hydraulic monitor]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, showing the sluicing of material from the adjacent borrow pit]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, showing the sluicing of material from the adjacent borrow pit]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, showing trestle supported flume]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, showing trestle supported flume]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, showing trestle supported flume and hydraulic monitors]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, showing trestle supported flume and hydraulic monitors]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, showing upstream side of dam]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, showing upstream side of dam]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, showing upstream side of sluice tower]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, showing upstream toe of dam]
Part of Major Matthews collection
[Partially constructed generator room for Buntzen Lake Power Plant number two]
Part of Major Matthews collection
[Partially constructed Horne-Payne substation]
Part of Major Matthews collection
[Partially constructed hydraulic tunnel for Buntzen Lake Power Plant number two]
Part of Major Matthews collection
Part of Major Matthews collection
Part of Major Matthews collection
Part of Major Matthews collection
Part of Major Matthews collection
[Partially constructed penstock for Buntzen Lake Power Plant number two]
Part of Major Matthews collection
Photograph shows railway track and pipe leading up hill.
[Partially constructed penstocks for Buntzen Lake Power Plant number two]
Part of Major Matthews collection
Photograph shows three sections of pipe leading up hill.
[Partially constructed penstocks for Buntzen Lake Power Plant number two]
Part of Major Matthews collection
Photograph shows men on the partially assembled pipes, including (left to right, sitting on scaffolding): F.S. Easton, Hydraulic Engineer for the B.C. Electric Railway Co., and Martin Tracey, Resident Engineer of the Buntzen Lake Power Plant.
[Partially constructed power house building for Buntzen Lake Power Plant number two]
Part of Major Matthews collection
[Partially constructed section of Buntzen Lake Power Plant number two]
Part of Major Matthews collection
Photographs shows a partially constructed base for the intake structure of the hydraulic tunnel. The base is constructed to carry a gate house containing three intake gates.
[Partially constructed Timms residence at Langley Prairie]
Part of Major Matthews collection
[Partially constructed trestle and flume across spillway cut of Coquitlam Dam]
Part of Major Matthews collection
[Partially contructed Jordan River Power Plant, showing north end of Amburson type concrete dam]
Part of Major Matthews collection
[Partially laid cable ducts in the sidewalk of the Georgia Viaduct]
Part of Major Matthews collection