[Construction of east portal of hydraulic tunnel for Buntzen Lake Power Plant number two]
- AM54-S4-: LGN 855
- Item
- [1913?]
Part of Major Matthews collection
570 results with digital objects Show results with digital objects
[Construction of east portal of hydraulic tunnel for Buntzen Lake Power Plant number two]
Part of Major Matthews collection
[Construction of penstock number one for Buntzen Lake Power Plant number two]
Part of Major Matthews collection
Photograph shows railway track and sections of pipe.
[Construction site for Coquitlam Dam, showing construction camp, flumes and borrow pit]
Part of Major Matthews collection
[Coquitlam Dam site covered in snow, looking west along line of upstream]
Part of Major Matthews collection
[Coquitlam dam site covered in snow, showing flume and settling pond]
Part of Major Matthews collection
[Partially constructed hydraulic tunnel for Buntzen Lake Power Plant number two]
Part of Major Matthews collection
Part of Major Matthews collection
[Underground cable manholes for Haro Street substation]
Part of Major Matthews collection
[Upstream side of partially constructed Coquitlam Dam, showing construction camp in the distance.]
Part of Major Matthews collection
[Various scenes regarding the activities of the B.C. Electric Railway Company]
Part of Major Matthews collection
Photograph negative is a copy of four photograph prints, showing: people assembled on porch for Director's visit to construction site; partially constructed Coquitlam Dam; water flowing through temporary gates of dam; and construction site for Coquitlam Dam. Negative was created to produce lantern slides of the four images.
[Three views of Coquitlam Dam construction]
Part of Major Matthews collection
Photograph negative is a copy of three photograph prints, showing: view of upstream side of dam; view along centre line of dam; and view of downstream side of dam. Negative was created in order to produce lantern slides of the three images.
[Replacement of upper sections of wood stove penstocks for Buntzen Lake Power Plant number one]
Part of Major Matthews collection
Photograph shows partially excavated pipes in foreground and part of Indian Arm in the distance.
Part of Major Matthews collection
Part of Major Matthews collection
[View of partially constructed Buntzen Lake Power Plant number two from Indian Arm]
Part of Major Matthews collection
View of settling pond taken from 750.0 looking towards 600.0 on 24th June 1913
Part of Major Matthews collection
Photograph shows partially constructed Coquitlam Dam, looking east on centre line of dam.
Panorama of dam site taken from co-ord. 2800.0 on 30th May 1913
Part of Major Matthews collection
Photograph shows partially constructed Coquitlam Dam, looking west on centre line of dam.
[Looking southwest from Hastings Street at Homer Street]
Part of Major Matthews collection
Panoramic view showing the Dominion Trust Building, the clock on top of the Vancouver Block, the spire of Holy Rosary Cathedral, part of the Hotel Canada, the Northwest Trust Company, a rooming house and other buildings
[Men constructing hydraulic tunnel for Buntzen Lake Power Plant number two]
Part of Major Matthews collection
[Headgate valve house for Coquitlam Dam]
Part of Major Matthews collection
Photograph shows building containing valves used to control the outflow from the lake during dam construction. Photograph also shows rock cut for the permanent overflow spillway, and the riprap facing of the upstream side of the dam.
Part of Major Matthews collection
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, looking along centre line of dam site]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, looking northeast toward borrow pit]
Part of Major Matthews collection
[Partially constructed Coquitlam dam, looking west along centre line of dam]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, showing the sluicing of material from the adjacent borrow pit]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, showing upstream side of dam]
Part of Major Matthews collection
[Four scenes regarding construction of Buntzen Lake power lines]
Part of Major Matthews collection
Photograph negative is a copy of four photograph prints, showing: men clearing land in forest; horses and supplies next to small dock; power poles and lines; rowboat and supplies in lake near dock.
[Looking north along Granville Street from Georgia Street towards North Vancouver]
Part of Major Matthews collection
Panoramic view showing billboards for Fletchers Pianos and Empress Coffee, the Bank of Montreal, the Post Office Clock tower, the C.P.R. Station and the North and/or West Vancouver ferries
[Looking northwest from Granville Street near Georgia Street towards the north shore]
Part of Major Matthews collection
Panoramic view showing the Hotel Abbotsford and other buildings and Coal Harbour and Brockton Point
[Construction of Brentwood Bay Steam Plant, viewed from inlet]
Part of Major Matthews collection
[Construction of main generating room for Buntzen Lake Power Plant number two]
Part of Major Matthews collection
[Downstream side of partially constructed Coquitlam Dam]
Part of Major Matthews collection
[Two views of Coquitlam Dam and Buntzen Lake Power Plant number two construction]
Part of Major Matthews collection
Photograph negative is a copy of two photograph prints, showing: man with donkey in front of openings for hydraulic tunnels to be connected to the surge tank with penstocks for Buntzen Lake Power Plant number two; and water flowing over the spillway at the Coquitlam Dam. Negative was created in order to produce lantern slides of the two images.
[View of construction of Brentwood Bay Steam Plant from inlet]
Part of Major Matthews collection
[Replacement of upper sections of wood stove penstocks for Buntzen Lake Power Plant number one]
Part of Major Matthews collection
Photograph shows a man standing on partially excavated section of pipe.
[Scaffolding and equipment for construction of Buntzen Lake Power Plant number two]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, showing downstream slope of dam]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, showing floor of spillway cut]
Part of Major Matthews collection
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, showing the sluicing of material from the adjacent borrow pit]
Part of Major Matthews collection
[Partially constructed Coquitlam Dam, showing upstream side of sluice tower]
Part of Major Matthews collection
[Partially constructed generator room for Buntzen Lake Power Plant number two]
Part of Major Matthews collection
Panorama of dam site taken from co-ord: 850.550S on 17th May 1913
Part of Major Matthews collection
Photograph shows Coquitlam Dam site, showing construction camp, flumes and borrow pit.
[Two men in partially constructed generator room for Buntzen Lake Power Plant number two
Part of Major Matthews collection
Part of Major Matthews collection
[Man standing with donkey at entrance to hydraulic tunnel for Buntzen Lake Power Plant number two]
Part of Major Matthews collection
[Men assembling turbo generator unit in Brentwood Bay Steam Plant]
Part of Major Matthews collection
[Men working on foundation of power house extension for Jordan River Power Plant]
Part of Major Matthews collection