Setting screeds and grading floor preparatory to placeing concrete floors in pulp warehouse
- AM1592-S8-2-F02-: 2011-092.6764
- Item
- Aug. 11, 1948
Setting screeds and grading floor preparatory to placeing concrete floors in pulp warehouse
Packing house foundation walls being backfilled
Filling railway grade for Tracks 1, 2 &3 east of the wet hopper
Completing hand excavation of beet pumphouse inforeground
Finishing the southeast quarter of the pulp warehouse floor
#3 flume excavated and graded, ready to receive flume bents
#1 flume and tailflume forms looking south from top of pulp warehouse
Finished floor in pulp warehouse
Installing sewers in main building
Beet pumphouse and #1 flume in foreground and tailflume extending south
Erecting truck bin storage tank at west end of pulp warehouse
Waste water pumphouse from the southwest
Excavating and laying tile at outfall end of waste water line looking southeast
Assembling #3 flume, looking west towards tailflume
Beet pumphouse foundation wall forms nearing completion
Moving third section of building #9 into position
Looking southeast from top of pulp warehouse
Junction of #3 and tailflume - looking east along #3
Forms for garage foundation nearing completion
Interior view of west end of pulp warehouse
Laying brick at east end of pulp warehouse
Roofing on north side of pulp warehouse
Laying tile for waste water line at station 92
Power house footings before erection of foundation wall forms
View of tailflume from pulp warehouse showing forms for #2 flume junction in place
Pulp drier steel being rivetted
Laying tile and erecting outside wall forms for garage
Beet wheel and beet washer set on foundations in wash house
Interior of machine shop looking east
Forming powerhouse foundation walls
Stripping east section of flume #1
Forming the second lift on the garage
Pouring outside foundation wall for power and boiler house
Working on junction of #1 and tail flume at beet pumphouse
Working in soft ground south of waste water pumphouse
Backfilling boiler and power house foundations
Erecting wall forms for beet pumphouse
Laying brick at west end of pulp warehouse
Finishing loading platform on south side of pulp warehouse
Grading piling area in background and tamping backfill on #2 flume in foreground
Finishing subgrade and setting screeds for pulp drier floor