Showing 538 results

Archival description
Taber (Alta.) Construction industry With digital objects
Print preview View:
General view of boiler & power house area showing commencement of structural steel erection
General view of boiler & power house area showing commencement of structural steel erection
General View of building area
General View of building area
General View of Building area looking Southeast
General View of Building area looking Southeast
General view of factory from scale house road
General view of factory from scale house road
General view of of interior of pulp warehosue looking east along temporary track
General view of of interior of pulp warehosue looking east along temporary track
General view of power & boiler house showing transite on roof of boiler house
General view of power & boiler house showing transite on roof of boiler house
General view of second floor showing third lift wall forms under construction
General view of second floor showing third lift wall forms under construction
General view of waste water lines from builk storage bins
General view of waste water lines from builk storage bins
General view showing first & second lift forming of pump warehouse walls, chimney in foreground
General view showing first & second lift forming of pump warehouse walls, chimney in foreground
General view showing roofing proceeding on pulp warehouse
General view showing roofing proceeding on pulp warehouse
Grader on Railroad Fill at Southeast end
Grader on Railroad Fill at Southeast end
Grading piling area at west end
Grading piling area at west end
Grading piling area in background and tamping backfill on #2 flume in foreground
Grading piling area in background and tamping backfill on #2 flume in foreground
Granulator in place
Granulator in place
Ground floor syrup storage tanks with melter tanks, #2 elevator pit
Ground floor syrup storage tanks with melter tanks, #2 elevator pit
Hoisting arrangement, with heating boiler on right
Hoisting arrangement, with heating boiler on right
Hoisting shell of lime kiln, removing main building scaffolding in background
Hoisting shell of lime kiln, removing main building scaffolding in background
Hot and cold air fans and precipitron housing
Hot and cold air fans and precipitron housing
Hot water tank with gas heater and hot water heating system controls in the office basement
Hot water tank with gas heater and hot water heating system controls in the office basement
Installation of catchall & condenser piping at the pan floor
Installation of catchall & condenser piping at the pan floor
Installation of dry pulp conveyors to penthouse of pulp warehouse
Installation of dry pulp conveyors to penthouse of pulp warehouse
Installation of switch board switch gear on battery
Installation of switch board switch gear on battery
Installation of tile refractory No. 2 boiler
Installation of tile refractory No. 2 boiler
Installing 16" diametre transite line in main building
Installing 16" diametre transite line in main building
Installing centrifugals
Installing centrifugals
Installing circulating tubes in No. 1 boiler
Installing circulating tubes in No. 1 boiler
Installing conduit for powerhouse machinery
Installing conduit for powerhouse machinery
Installing fans for Oliver vapor exhaust system
Installing fans for Oliver vapor exhaust system
Installing fixtures in storeroom
Installing fixtures in storeroom
Installing glass blocks in north wall of pulp drier building
Installing glass blocks in north wall of pulp drier building
Installing pipe lines & pump motors in molasses pump house
Installing pipe lines & pump motors in molasses pump house
Installing relief valves on exhaust lines at deaerator
Installing relief valves on exhaust lines at deaerator
Installing rock catcher in beet pumphouse
Installing rock catcher in beet pumphouse
Installing sewers in main building
Installing sewers in main building
Installing the reinforcing and conduit for office senond floor slab
Installing the reinforcing and conduit for office senond floor slab
Installing transite siding on wet hopper superstructure
Installing transite siding on wet hopper superstructure
Interior of boiler house showing foundations of No. 1 & inter-campaign boiler
Interior of boiler house showing foundations of No. 1 & inter-campaign boiler
Interior of machine shop looking east
Interior of machine shop looking east
Interior of men's washroom
Interior of men's washroom
Interior view gas reducing station
Interior view gas reducing station
Interior view of beet end wall forms showing arrangement of scaffolding
Interior view of beet end wall forms showing arrangement of scaffolding
Interior view of west end of pulp warehouse
Interior view of west end of pulp warehouse
Interior view of west end of pulp warehouse showing forms ready for first lift pour
Interior view of west end of pulp warehouse showing forms ready for first lift pour
Junction of #3 and tailflume - looking east along #3
Junction of #3 and tailflume - looking east along #3
Kaughman moving the Administration Building into position
Kaughman moving the Administration Building into position
Laying blocks and installing door frame of locomotive shed
Laying blocks and installing door frame of locomotive shed
Laying brick at east end of pulp warehouse
Laying brick at east end of pulp warehouse
Laying brick at waste water pumphouse
Laying brick at waste water pumphouse
Laying brick at west end of pulp warehouse
Laying brick at west end of pulp warehouse
Laying brick for pulp dryer furnace, part of press floor poured
Laying brick for pulp dryer furnace, part of press floor poured
Results 201 to 250 of 538