Beet end steel erected to date
- AM1592-S8-2-F02-: 2011-092.6852
- Item
- Dec. 29, 1948
4134 results with digital objects Show results with digital objects
Beet end steel erected to date
Beet flumes under construction
Beet pumphouse and #1 flume in foreground and tailflume extending south
Beet pumphouse foundation wall forms nearing completion
Beet pumphouse from top of pulp warehouse
Beet storage water line and wet hopper pump house
Beet washer drive and beet wheel
Beet wheel and beet washer set on foundations in wash house
Beginning of erection of waste water pumphouse wall forms - looking south
Begin[ning of first] Hotel Vancouver
Beginning to pour cement for bins in fall of 1947
Bellingham and Stanley pan refractometer with A.D. Chapman's automatic adaptation, installed on pan
Bellingham and Stanley pan refractometer with A.D. Chapman's automatic adaptation, installed on pan
Bellingham and Stanley pan refractometer with A.D. Chapman's automatic adaptation, installed on pan
Bin platform showing jacks, rods
Blow ups filter house: interior view
[Boards and other debris in excavation area for Buntzen Lake Power Plant number one]
Part of Major Matthews collection
[Boats near dock piled with lumber for construction of Buntzen Lake Power Plant number one]
Part of Major Matthews collection
Body sections, and catchalls for Taber pans as fabricated in Vancouver Refinery shops
Boiler # 2 showing tack tubes in place
Boiler #1 & #2, showing baffle tile in #2
Boiler and flume in boiler house
Boiler foundation being stripped and backfilled
Boiler foundation forms being completed
Boiler house and power house brickwork
Boiler house siding and power house roof
Boiler house steel and 3rd evaporator
Boiler house structural steel complete
Boiler house structural steel with 1st forms in place
Boiler, dressing tube ends in foreground