Excavation of Bulk Stoage in Progress
- AM1592-S8-2-F01-: 2011-092.6448
- Item
- May 29, 1947
587 results with digital objects Show results with digital objects
Excavation of Bulk Stoage in Progress
Exvacation for molasses tanks & Pumphouse at rear of boiler house
F.H.B. [Frank H. Ballou?], L.R.P. and Wes Smith standing on site
Fifth lift on chimney being erected by Rust Engineering Co.
Filling railway grade for Tracks 1, 2 &3 east of the wet hopper
Finished floor in pulp warehouse
Finishing loading platform on south side of pulp warehouse
Finishing subgrade and setting screeds for pulp drier floor
Finishing the apron in front of the garage
Finishing the southeast quarter of the pulp warehouse floor
Finishing topping office second floor
Finishing topping on cutter floor
Finishing touches being put on chimney
First floor slab of office building
First floor wall partitions ready for plastering
First lift forms for power house walls
First lift wall forms for beet end
First lift wall forms for office building
Footings for walls of generator
Footings on the North side of the Sugar Warehouse
Forming first lift of pulp drier walls
Forming foundation wall between power house & main building
Forming fuel oil tank retaining wall, crated switchgear & boiler breeching
Forming office building foundation walls
Forming powerhouse foundation walls
Forming Pulp Warehouse foundation wall
Forming slab of the reservoir section fo the Waste Water Pump House
Forming the second lift on the garage
Forming third lift of pulp drier bluiding nearing completion
Forming third lift walls on power & boiler house
Forming up the bin floor on Number 3
Forms for foundation wall of gas reducing station
Forms for garage foundation nearing completion
Forms for limerock unloading ramp in foregraound & installing windows in boiler house
Forms for office building foundation walls
Forms for office foundation walls
Foundation walls of waste water pumphouse and forming walls of reservoir section
Front view of factory showing fourth lift forms on beet end walls and second lift stripped
Front view of intercampaign heating boiler
Frost fence & piling ground from east end of #3 flume
Frost fence and wet hopper superstructure
Garage and carpenters shack removed [exterior elevation of factory and bins]
Gas piping for 1st & 2nd carbonation stations