Sugar end showing addition of "B" pan
- AM1592-S8-2-F02-: 2011-092.6936
- Item
- May 11, 1949
Sugar end showing addition of "B" pan
Sugar end showing main & hot water tanks on fifth floor
Sugar end steel from top of bulk storage
Sugar end steel showing Rotex screen on fifth floor
Sugar Warehosue Steel Erection
Sugar Warehouse from southeast
Sugar Warehouse looking South-East
Sugar Warehouse Pour under way
Sulphur bin and pattern platform steel
Taking borings for soil test, Chinook factory
Tank being lifted into place by crane, construction site and workers
Temporary Buildings ferom the top of the Cement Shed
Temporary Construction Track, Saw Shed, etc. looking S.E.
Temporary office, store-house, ground test, pile driver in position
Temporary office, store-house, ground test, pile driver in position
The Administration Building and Gravel Pile, looking north
The Administration Building being renovated
The boiler foundations from the top of the machine shop
The Gas Company ditcher about to cut the Railway Crossing
The railroad grade at the southeast end
The Site, looking N.E. along Track 9
Third Lift forms for Sugar Warehouse
Third lift wall forms being erected for power and boiler house
Track #9 with Tracks 4, 7 & 8 branching West
Track crew at work on No. 8 Switch
Trash house brickwork and roof trusses
Truss immediately after dropping
Tubing for No. 2 boiler completed & construction of No. 1 boiler
Turbine exhaust piping at deaerator
Two men standing by a cabin in the snow
Use leader sugar tools: made by the leader evaporator co. Burlington VT. [photograph of sign]
Using pneumatic tamper to compact base for machine shop floor
View from bulk storage showing prime coat being applied to vermiculite fill on beet end
View from catwalk showing various lines
Item consists of a photograph annotated to indicate: 1) 8" Oliver vacuum line; 2) 6" raw juice line from metre to heater; 3) 12" third vapour to heaters; 4) 16" 1st vapor to A & B pans; 5) 14" 2nd vapor to C, D & E pans.
View from east showing building progress with lime house equipment
View from machine shop showing west wall stripped and backfilled
View from north end of power house showing deaerator heater platform