- AM1592-S8-2-F03-: 2011-092.7014
- Item
- Aug. 3, 1949
Showing 1911 results
Archival descriptionHoisting shell of lime kiln, removing main building scaffolding in background
- AM1592-S8-2-F03-: 2011-092.7015
- Item
- Aug. 3, 1949
View from bulk storage showing prime coat being applied to vermiculite fill on beet end
- AM1592-S8-2-F03-: 2011-092.7016
- Item
- Aug. 3, 1949
Laying brick for pulp dryer furnace, part of press floor poured
- AM1592-S8-2-F03-: 2011-092.7017
- Item
- Aug. 10, 1949
View from north end of power house showing deaerator heater platform
- AM1592-S8-2-F03-: 2011-092.7018
- Item
- Aug. 10, 1949
Forming fuel oil tank retaining wall, crated switchgear & boiler breeching
- AM1592-S8-2-F03-: 2011-092.7019
- Item
- Aug. 10, 1949
East elevation of factory, placing distributor head on lime kiln
- AM1592-S8-2-F03-: 2011-092.7020
- Item
- Aug. 10, 1949
Looking south-west into wash house showing trash catcher under construction
- AM1592-S8-2-F03-: 2011-092.7021
- Item
- Aug. 17, 1949
Looking east into pulp dryer with furnace brick being laid
- AM1592-S8-2-F03-: 2011-092.7022
- Item
- Aug. 17, 1949
Laying fire brick in No. 2 boiler, superheater tubes on floor
- AM1592-S8-2-F03-: 2011-092.7023
- Item
- Aug. 17, 1949
Looking south from bulk storage tower showing main building & sugar end cupola roofing
- AM1592-S8-2-F03-: 2011-092.7024
- Item
- Aug. 17, 1949
Lifting No. 2 boiler breeching in place; fuel oil tank footings in foreground
- AM1592-S8-2-F03-: 2011-092.7025
- Item
- Aug. 17, 1949
Structural steel for lime kiln tower nearing completion
- AM1592-S8-2-F03-: 2011-092.7026
- Item
- Aug. 24, 1949
Beet end juice pumps in place on bases
- AM1592-S8-2-F03-: 2011-092.7027
- Item
- Aug. 24, 1949
Pulp dryer furnace brick work proceeding
- AM1592-S8-2-F03-: 2011-092.7028
- Item
- Aug. 24, 1949
Steam generator No. 1 showing gas bruner opernings and super-heater headers
- AM1592-S8-2-F03-: 2011-092.7029
- Item
- Aug. 24, 1949
Pouring last lift of main building
- AM1592-S8-2-F03-: 2011-092.7030
- Item
- Aug. 31, 1949
- AM1592-S8-2-F03-: 2011-092.7031
- Item
- Aug. 31, 1949
Lime house steel nearing completion
- AM1592-S8-2-F03-: 2011-092.7032
- Item
- Aug. 31, 1949
Roofing on main building proceeding; pouring 6th lift sugar end
- AM1592-S8-2-F03-: 2011-092.7033
- Item
- Aug. 31, 1949
Office basement showing plumbing and heating piping being installed
- AM1592-S8-2-F03-: 2011-092.7034
- Item
- Aug. 31, 1949
Placing under-floor conduits for switchgear and control panels
- AM1592-S8-2-F03-: 2011-092.7035
- Item
- Sep. 7, 1949
Pouring first lift of lime house walls
- AM1592-S8-2-F03-: 2011-092.7036
- Item
- Sep. 7, 1949
Molasses tanks in course of erection
- AM1592-S8-2-F03-: 2011-092.7037
- Item
- Sep. 7, 1949
- AM1592-S8-2-F03-: 2011-092.7038
- Item
- Sep. 14, 1949
Placing rafters on No. 1 molasses storage tank, No. 2 ready for testing
- AM1592-S8-2-F03-: 2011-092.7039
- Item
- Sep. 14, 1949
Installation of tile refractory No. 2 boiler
- AM1592-S8-2-F03-: 2011-092.7040
- Item
- Sep. 14, 1949
Plastering monitor parapet wall
- AM1592-S8-2-F03-: 2011-092.7041
- Item
- Sep. 14, 1949
Finishing topping office second floor
- AM1592-S8-2-F03-: 2011-092.7042
- Item
- Sep. 14, 1949
- AM1592-S8-2-F03-: 2011-092.7043
- Item
- Sep. 21, 1949
Excavation for No. 9 track and footings for warehouse canopy
- AM1592-S8-2-F03-: 2011-092.7044
- Item
- Sep. 21, 1949
Southwest corner of pulp warehouse showing bag conveyor and heaters platform
- AM1592-S8-2-F03-: 2011-092.7045
- Item
- Sep. 21, 1949
No. 2 boiler insulation completd on side walls
- AM1592-S8-2-F03-: 2011-092.7046
- Item
- Sep. 21, 1949
Looking north-east at beet end juice pumps and piping
- AM1592-S8-2-F03-: 2011-092.7047
- Item
- Sep. 21, 1949
Placing vermiculite on the power house roof
- AM1592-S8-2-F03-: 2011-092.7048
- Item
- Sep. 28, 1949
South side of first floor showing giproc [gyprock] lath and hyrib [Hy-Rib] lath
- AM1592-S8-2-F03-: 2011-092.7049
- Item
- Sep. 28, 1949
Piping under carbonation tanks
- AM1592-S8-2-F03-: 2011-092.7050
- Item
- Sep. 28, 1949
Welding roof on oil storage tank
- AM1592-S8-2-F03-: 2011-092.7051
- Item
- Sep. 28, 1949
Wiring No. 26 Cabinetrol pulp warehouse
- AM1592-S8-2-F03-: 2011-092.7052
- Item
- Oct. 5, 1949
Installing conduit for powerhouse machinery
- AM1592-S8-2-F03-: 2011-092.7053
- Item
- Oct. 5, 1949
Erecting sugar warehouse canopy steel
- AM1592-S8-2-F03-: 2011-092.7054
- Item
- Oct. 5, 1949
Laying vermiculite on the west end of sugar warehouse
- AM1592-S8-2-F03-: 2011-092.7055
- Item
- Oct. 5, 1949
Looking east at rear of the heating and main boilers
- AM1592-S8-2-F03-: 2011-092.7056
- Item
- Oct. 5, 1949
Canopy steel erected and rivetting about completed
- AM1592-S8-2-F03-: 2011-092.7057
- Item
- Oct. 14, 1949
- AM1592-S8-2-F03-: 2011-092.7058
- Item
- Oct. 14, 1949
First floor wall partitions ready for plastering
- AM1592-S8-2-F03-: 2011-092.7059
- Item
- Oct. 14, 1949
Cutter floor showing motor bases in place, conduit being installed and reinforcing in place
- AM1592-S8-2-F03-: 2011-092.7060
- Item
- Oct. 19, 1949
Picking table floor showing picking table under construction
- AM1592-S8-2-F03-: 2011-092.7061
- Item
- Oct. 19, 1949
Crystallizers showing platform & stairway under construction
- AM1592-S8-2-F03-: 2011-092.7062
- Item
- Oct. 19, 1949
Sulphur bin and pattern platform steel
- AM1592-S8-2-F03-: 2011-092.7063
- Item
- Oct. 19, 1949