Building up form for the South Wall Sugar Warehouse
Bulk Storage - Pouring foundation on to slabs
Bulk Storage - Pouring foundation on to slabs
Bulk Storage - Pouring foundation on to slabs
Bulk Storage - Pouring foundation on to slabs
Bulk Storage - Pouring foundation on to slabs
Bulk Storage - Pouring foundation on to slabs
Bulk Storage - Pouring foundation on to slabs
Bulk Storage - Slab reinforcing looking north
Bulk Storage Bins 3 & 4
Bulk Storage Bins showing Basement wall forming
Bulk Storage bins with cupola stripped and penthouse forms in place
Bulk Storage Bins, Cupola and Penthouse with outside forms removed
Bulk Storage Excavation from Cement Shed
Bulk Storage Excavation looking Southwest
Bulldozer trimming up Bulk Storage excavation
Calandria with cone bottom in place (Taber pans)
Calandrias for Taber pans in refinery plate shop, Vancouver
Canopy steel erected and rivetting about completed
Cement Shed, Bunkers and Substation looking N.E.
Chimney at elevation 127'-6" above base
Collapse of hoisting tower (1)
Collapse of hoisting tower (2)
Commencing to place reinforcing in south end of Bulk Storage
Completed Bulk Storage Slab - Looking North
Completed form for second wall lift of pulp drier building
Completed foundations of waste water pumphouse
Completing forms for the last lift on the boiler house walls
Completing foundation wall forms between columns
Completing hand excavation of beet pumphouse inforeground
Completing turbo-generator foundation and starting generator pit footings
Completing wall pour on Intake House
Completion of erection of first shipment of beet end structural steel
Completion of main building structural steel as viewed from north side of sugar warehouse
Completion of pulp drier structural steel
Control valves on evaperators and pan condensers
Crawler Crane digging intake Canal toward Reservoir (looking North-East)
Crawler stockpiling coarse aggregate behind gravel bin
Crystallizers in place
Crystallizers showing drives
Crystallizers showing platform & stairway under construction
C.S.F. Site, Temporary Cookhouse footings in Background
Cutter floor showing motor bases in place, conduit being installed and reinforcing in place
Diesel oil tank storage erected at left and completed
Diffuser foundation and piers
Domestic water filtration plant in powerhouse
Dorr tank erection nearly completed
Dragline - Digging Intake Ditch for Main Water Line (looking North-East)
Driving piles for chimney foundation
East elevation of factory, placing distributor head on lime kiln