[Three rail joints, showing various types of rail bonds]
- AM54-S4-: LGN 1219.3
- Item
- [191-?]
Part of Major Matthews collection
155 results with digital objects Show results with digital objects
[Three rail joints, showing various types of rail bonds]
Part of Major Matthews collection
[Three rail joints, showing various types of rail bonds]
Part of Major Matthews collection
[Three rail joints, showing various types of rail bonds]
Part of Major Matthews collection
[Three rail joints, showing various types of rail bonds]
Part of Major Matthews collection
[Three rail joints, showing various types of rail bonds]
Part of Major Matthews collection
[Piece of cable damaged by electrical arcing]
Part of Major Matthews collection
[View of overhead trolley wires]
Part of Major Matthews collection
Part of Major Matthews collection
Part of Major Matthews collection
Part of Major Matthews collection
Part of Major Matthews collection
Photograph shoes truck, as well as lamps, stove and washing machine.
[Piece of wire embedded in section of tree branch]
Part of Major Matthews collection
[Rowboat tied to dock at edge of lake]
Part of Major Matthews collection
Part of Major Matthews collection
[Partially constructed Buntzen Lake Power Plant number two, viewed from Indian Arm]
Part of Major Matthews collection
[Derrick for lifting transformers to transformer house of Buntzen Lake Power Plant number one]
Part of Major Matthews collection
Part of Major Matthews collection
[Interior of power house of Buntzen Lake Power Plant number two, showing low voltage switch gallery]
Part of Major Matthews collection
[Upper portion of penstock number one for Buntzen Lake Power Plant number two]
Part of Major Matthews collection
Photograph shows section of penstock, butterfly valve and air vent intake pipe in background, and section for assembly of penstock number two behind beam of erection derrick.
[Partially constructed penstocks for Buntzen Lake Power Plant number two]
Part of Major Matthews collection
Photograph shows men on the partially assembled pipes, including (left to right, sitting on scaffolding): F.S. Easton, Hydraulic Engineer for the B.C. Electric Railway Co., and Martin Tracey, Resident Engineer of the Buntzen Lake Power Plant.
[Reconstruction of upper portion of penstocks for Buntzen Lake Power Plant number one]
Part of Major Matthews collection
Photograph shows the pipes in the process of having the original wood stove sections replaced with rivetted steel sections.
[Construction of penstock on hillside behind Buntzen Lake Power Plant number one]
Part of Major Matthews collection
[Construction of penstock on hillside behind Buntzen Lake Power Plant number one]
Part of Major Matthews collection
Part of Major Matthews collection
[Power house of the Buntzen Lake Power Plant number two]
Part of Major Matthews collection
Photograph is a copy of a drawing of the power house building.
[Partially cleared site of the Buntzen Lake Power Plant number two, viewed from Indian Arm]
Part of Major Matthews collection
[Men working on partially cleared site of the Buntzen Lake Power Plant number two]
Part of Major Matthews collection
[Internal parts of electric transformer damaged by fire]
Part of Major Matthews collection
[Four views of Coquitlam Dam and Buntzen Lake Power Plant number two construction
Part of Major Matthews collection
Photograph negative is a copy of four photograph prints, showing: early excavation at Buntzen Lake power house site; view looking up Coquitlam Lake from east end of dam, showing cleared shores that will be submerged when water levels are raised; trestle work for Coquitlam Dam; and downstream view of original Coquitlam Dam, showing construction sawmill in the background. Negative was created in order to produce lantern slides of the four images.
Buntzen-Coquitlam hydro-electric development - Key map
Part of Major Matthews collection
Photograph negative is a copy of a technical drawing showing profiles of hydraulic tunnels for the Coquitlam Dam and the Buntzen Lake Power Plant number two; and of a map showing the Lower Mainland area. Negative was created in order to produce lantern slides of the two images.
[Construction of Buntzen Lake Power Plant number one]
Part of Major Matthews collection
[Rebuilding of upper end of penstocks 1 to 4 for Buntzen Lake Power Plant number one]
Part of Major Matthews collection
Photograph shows workers with partially constructed pipe.
[Rebuilding of upper end of penstocks 1 to 4 for Buntzen Lake Power Plant number one]
Part of Major Matthews collection
Photograph shows men working on section of pipe.
[Rebuilding of upper end of penstocks 1 to 4 for Buntzen Lake Power Plant number one]
Part of Major Matthews collection
Photograph shows large trench between pipes.
[Rebuilding of upper end of penstocks 1 to 4 for Buntzen Lake Power Plant number one]
Part of Major Matthews collection
Photograph shows various sections of pipe on ground.
[View of Buntzen Lake Power Plant number one from Indian Arm]
Part of Major Matthews collection
[Replacement of upper sections of wood stove penstocks for Buntzen Lake Power Plant number one]
Part of Major Matthews collection
Photograph shows a man standing on partially excavated section of pipe.
[Replacement of upper sections of wood stove penstocks for Buntzen Lake Power Plant number one]
Part of Major Matthews collection
Photograph shows partially excavated pipes in foreground and part of Indian Arm in the distance.
[View of Buntzen Lake Power Plant from Indian Arm]
Part of Major Matthews collection
[Replacement of upper section of wood stove penstocks for Buntzen Lake Power Plant number one]
Part of Major Matthews collection
Photograph shows men woking on partially completed section of pipe.
[Scaffolding and equipment for construction of Buntzen Lake Power Plant number two]
Part of Major Matthews collection
[Collapsed structure and equipment, from construction of Buntzen Lake Power Plant number two]
Part of Major Matthews collection
[Scaffolding and equipment for construction of Buntzen Lake Power Plant number two]
Part of Major Matthews collection
[Partially completed Buntzen Lake Power Plant number two, surrounded by scaffolding]
Part of Major Matthews collection
[Interior of gate house on west shore for Buntzen Lake Power Plant number two]
Part of Major Matthews collection
[Exterior of gate house on west shore for Buntzen Lake Power Plant number two]
Part of Major Matthews collection
[Men standing outside surge tank of hydraulic tunnel from Buntzen Lake]
Part of Major Matthews collection
[Partially constructed generator room for Buntzen Lake Power Plant number two]
Part of Major Matthews collection
[Two men in partially constructed generator room for Buntzen Lake Power Plant number two
Part of Major Matthews collection
[Four men standing outside partially constructed gate house for Buntzen Lake Power Plant number two]
Part of Major Matthews collection