Looking east from top of pulp warehouse
- AM1592-S8-2-F02-: 2011-092.6814
- Item
- Oct. 20, 1948
4612 results with digital objects Show results with digital objects
Looking east from top of pulp warehouse
Excavation for boiler foundation
Beet pumphouse from top of pulp warehouse
Grading piling area at west end
Boiler foundation forms being completed
Forming the second lift on the garage
Laying tile and erecting outside wall forms for garage
Finishing loading platform on south side of pulp warehouse
Stripping east section of flume #1
Working in soft ground south of waste water pumphouse
Pulp drier building, 1st lift form stripped
Substation at waste water pumphouse
Welding evatorators, erecting catwalk, digging trench along power house foundation
Forms for office foundation walls
General view from top of bulk storage showing transite completed
Forming office building foundation walls
Pouring anchor blocks on wet hopper water line, laying tile for pulp warehouse roof drains
Interior view of beet end wall forms showing arrangement of scaffolding
Pulp drier building showing molasses tanks
Front view of factory showing fourth lift forms on beet end walls and second lift stripped
Completing forms for the last lift on the boiler house walls
South side of pulp warehouse showing excavation & backfilling of trenches for roof drains
Main building structural steel from top of bins
Taber factory progress photographs 1949-1950
File consists of the third batch of photographs documenting the construction of the Canadian Sugar Factories sugar beet refinery in Taber, Alberta. The photographs in this file carry one from those in AM1592-S8-2-F02.
Installing relief valves on exhaust lines at deaerator
Turbine exhaust piping at deaerator
Piping on control valves on juice heaters
South side of first floor showing giproc [gyprock] lath and hyrib [Hy-Rib] lath
Pouring first lift of lime house walls
Molasses tanks in course of erection
Office basement showing plumbing and heating piping being installed
Looking north-east at beet end juice pumps and piping
Forming fuel oil tank retaining wall, crated switchgear & boiler breeching
Placing vermiculite on the power house roof
Powerhouse switch board in place
Lime house showing the concret slab
Placing floor reinforcing under the granulator at col. 125 - 225 - 228 - 128 bay
Canopy steel erected and rivetting about completed
Installation of switch board switch gear on battery
Picking table floor showing picking table under construction
Looking east at rear of the heating and main boilers