View of boiler house from power house showing intercampaign boiler being bricked up
- AM1592-S8-2-F03-: 2011-092.7012
- Item
- Aug. 3, 1949
538 results with digital objects Show results with digital objects
View of boiler house from power house showing intercampaign boiler being bricked up
View of boiler house showing intercampaign boiler #1 & #2
View of bulk storage bins from the west, showing the windows and flashing installation
View of completed framework of pulp warehouse from east
View of inside wall forms of Sugar Warehouse
View of second floor from behind sulphur tower showing assembly of standard liquor heaters
View of tailflume from pulp warehouse showing forms for #2 flume junction in place
Wall Footings of the Sugar Warehouse (looking East)
Wash House, Pulp Drier & Wet Hopper in background
Waste waer pump installation looking north
Waste water pumphouse and start of sheet pile driving
Waste water pumphouse from the southwest
Welding evatorators, erecting catwalk, digging trench along power house foundation
Welding roof on oil storage tank
Welding top cover of Dorr tank
West elevation of factory showing third lift shows stripped last lift being formed
West elevation of main building
West elevator from factory site gate
West end connection steel of sugar warehouse
West end of machine shop and storeroom
West end of pulp warehouse showing first lift stripped
West end of pulp warehouse showing Truck bin supporting steel and conveyor tunnel forming
West end of sugar warehouse showing completed wall and forms for first lift on 1 & 5 column lines
Wet and soaking hoppers with piling area in background
Wet hopper superstructure showing spray piping & stairs
Wiring No. 26 Cabinetrol pulp warehouse
Working in soft ground south of waste water pumphouse
Working on junction of #1 and tail flume at beet pumphouse