Chairlift [Mount Seymour, reel 4]
- AM1545-: 2013-020.17
- Item
- [1962 or 1963]
Item is a film showing the opening of the Mount Seymour chair lift with speeches and inspection certificate presentation. People line up to use the chairlift and ski around the slopes. Description from the B.C. Archives: Construction of the Mount Seymour chair lift, from the fabrication and casting of components at machine shops and foundries, transportation of components to the site, etc. through on-site construction, assembly, testing, opening and actual operation of the lift system during ski season.