24" x 8'-0" oil reservoir for 6'-6" needle intake valves [used for Buntzen Lake Power Plant number two]
A Battery of Pasturizers in the Plant
[A "Caterpillar" tractor and P&H Shovel excavating a pipe line]
[A construction engine hauling lumber for the construction of Buntzen Lake Dam]
[A man on a wire attached to a branchless trees]
[A McNair logging engine that fell off the Hollyburn Wharf ]
[A rubber tire stripping invention by Halmrast]
[A steel tree spar for a logger's convention beside the Hotel Vancouver]
[A "Sullivan" compressor powered by a "Caterpillar" engine during construction of the Hope-Princeton Road]
[A "Sullivan" compressor powered by a "Caterpillar" engine on the Royal Engineers' Trail during construction of the Hope-Princeton Road]
[A"Caterpillar" Diesel D8 tractor with a Hyster double drum tractor and a donkey hoist at the Bridge River Project]
[An Elk River Timber Company "Caterpillar" Diesel D8 tractor with a Hyster winch and logging arch]
Assembly of 72" butterfly valve for Vancouver Power Co. [used for Buntzen Lake Power Plant number two]
Base for 6'-6" needle intake valve [used for Buntzen Lake Power Plant number two]
[B.C.E.R. cars being loaded at Little Mountain Quarry]
Bearing of a gland for 72" butterfly valve [used for Buntzen Lake Power Plant number two]
Boiler house - Gordon Pasha Lake, Camp 6 - Brooks-Scanlon-O'Brien Company Limited
[Buildings and machinery in partially cleared area]
["Caterpillar" equipment being used during the Hope-Princeton (Princeton-Hesley) Road construction]
["Caterpillar" equipment being used during the Hope-Princeton (Princeton-Hesley) Road construction]
Chapman and Walker [Electric Machinery and Supplies display at] Vancouver Exhibition
[Chlorinating machinery at the Capilano Waterworks]
[Chlorinating machinery at the Capilano Waterworks intake]
[Clearing the debris of the washed-out road at 25th Street and Mathers Avenue]
[Construction of main generating room for Buntzen Lake Power Plant number two]
Coquitlam Dam [showing] drag bucket loading
Coquitlam Dam [showing] hydraulic monitor sluicing material
Coquitlam Dam view of headworks channel cut looking towards headworks
[C.P.R. construction crew and steam shovel at Moutain Creek]
Cylinder support for 6'-6" needle intake valve [used for Buntzen Lake Power Plant number two]
[Derrick for lifting transformers to transformer house of Buntzen Lake Power Plant number one]
Details of 50' "A" frame [used for overhead cableways in construction of Coquitlam Dam]
Details of 60' "A" frame [used for overhead cableways in construction of Coquitlam Dam]
Details of valve stem and indicator rod for 6'-6" needle intake valve [used for Buntzen Lake Power Plant]
[Diagram showing electrical connections of rectifier for New Westminster High School]
Disk for 72" butterfly valve [used for Buntzen Lake Power Plant number two]
Donkey engine at Gordon Pasha Lake - Eagle River area - Brooks-Scanlon-O'Brien Company Limited
Drag shovel [for] Eagle River and Northern Railway tunnel construction at Eagle River Canyon [for] logging - Brooks-Scanlon-O'Brien Company Limited
Electric hoist #1839-40 [used for overhead cableway in construction of Coquitlam Dam]
[Electric wiring and machinery in grist mill and pump]
[Electrically powered canning machinery at B.C. Milk Condensing Co. Ltd.]
Engine Control Panel - Test House - B.A.E.L and C.W.L. - Sea Island, B.C.
Engine Room. Texas Lake Ice and Cold Storage Co. [Front Street]
[Equipment and chart inside streetcar]
[Equipment inside streetcar]
[Excavating at corner of 11th Avenue and Maple Street for new drill hall]
[Excavation of the new Public Library site - corner of Burrard and Robson Streets]
Face of cliff and start of rock excavation on site of No. 2 plant
First Avenue Viaduct - Dominion Construction Company Limited, Contractors
First Narrows Pressure Tunnel, South Shaft, Valve Chamber, Shaft Cap and Connecting Pipes