- Item: CVA 265-15 - Concrete foundations of North Shore bridge-cable anchorage, sunk to a depth of thirty-five feet.
- Item: CVA 265-13 - Concrete pier adjoining end of steel on North Shore approach . Now all filled in and traffic passes over roadbed at top of pier.
- Item: CVA 265-19 - Construction of number two caisson framework from Prospect Point. Bridge ferry-boat is seen heading for North Shore Plant
- Item: CVA 265-4 - Dredge getting depth on North Shore for basin for anchorage scows carrying building material
- Item: CVA 265-62 - Due to the tide, the scow carrying this first road section made two attempts before its position was just right for releasing its heavy load of steel.
- Item: CVA 265-64 - Erection of the first sections of steel for the roadbed where it enters Stanley Park. Sections suspended on wire cables hanging from main cable.
- Item: CVA 265-14 - First rough grading of roadway through Stanley Park near bridge-head. Now a fine concrete driveway.
- Item: CVA 265-22 - Foundation of North Shore pier sunk into position. It will support north tower: will be filled with concrete later.
- Item: CVA 265-26 - Granite rocks were dumped inside the edge of this caisson before cement was poured. Pump is carrying off water that has seeped through.