- FondsAM54 - Major Matthews collection
- SeriesS9 - First Narrows Bridge
- FileF1 - First Narrows Bridge Photographs Vol. 3
- 13 more...
- Item: CVA 265-27 - Big 61-strand cables which support roadway, pass down these concrete "steps" into the cable anchorage on South Shore
- Item: CVA 265-51 - Both bridge towers are finished and first few sections of catwalk have been raised into position. Taken from West Vancouver ferry wharf.
- Item: CVA 265-8 - Bridge construction plant from Prospect Point. Everything in readiness for commencing the two caissons.
- Item: CVA 265-44 - Bridge-head in Stanley Park. Steel suspension cables will be held in position on top of the two steel pillars as they pass into cable anchorage below.
- Item: CVA 265-7 - Building rock-filled cribbing at water's edge on South Shore which are foundations for derricks. Rocks and logs brought by scows
- Item: CVA 265-70 - Catwalks are now being taken down in sections. Marine Signal station in center.
- Item: CVA 265-55 - Clamping the last of the 61 wire ropes which go into each cable. One of the cable anchorages on the South Shore.
- Item: CVA 265-1 - Clearing operations, North Shore bridge approach. Finished driveway runs about 100 feet above blasted stumps of the first slash
- Item: CVA 265-17 - Close-up of one of concrete foundations for steel-work on North Shore approach. Concrete is strongly reinforced with steel.
- 50 more...