- FondsAM54 - Major Matthews collection
- SeriesS9 - First Narrows Bridge
- FileF1 - First Narrows Bridge Photographs Vol. 3
- 9 more...
- Item: CVA 265-48 - At 6:00 a.m. the catwalk cables (from one tower only) were secured. Exactly 6 months later the last of the 8 catwalk cables was taken down.
- Item: CVA 265-36 - At this time the steel work of the South tower was within two sections of top. Picture shows how "creeper" operates, rising with each section.
- Item: CVA 265-21 - Beginning of big rock fill at base of pier on North approach. Bridge joins this pier and the roadway rests on top of it.
- Item: CVA 265-10 - Beginning of the first caisson and general view of construction plant on South Shore from Prospect Point
- Item: CVA 265-27 - Big 61-strand cables which support roadway, pass down these concrete "steps" into the cable anchorage on South Shore
- Item: CVA 265-51 - Both bridge towers are finished and first few sections of catwalk have been raised into position. Taken from West Vancouver ferry wharf.
- Item: CVA 265-8 - Bridge construction plant from Prospect Point. Everything in readiness for commencing the two caissons.
- Item: CVA 265-44 - Bridge-head in Stanley Park. Steel suspension cables will be held in position on top of the two steel pillars as they pass into cable anchorage below.
- Item: CVA 265-7 - Building rock-filled cribbing at water's edge on South Shore which are foundations for derricks. Rocks and logs brought by scows
- 54 more...