Bookmark and Share

View archival description

Item : MI-466 - Everest - master 6
Reports

Part of Yaletown Productions Inc. fonds

Download movie

Title and statement of responsibility area

Title proper

Everest - master 6

General material designation

  • Moving images

Parallel title

Other title information

Title statements of responsibility

Title notes

  • Source of title proper: Title transcribed from item.

Level of description

Item

Reference code

AM1553-8-S6-: MI-466

Edition area

Edition statement

Edition statement of responsibility

Class of material specific details area

Statement of scale (cartographic)

Statement of projection (cartographic)

Statement of coordinates (cartographic)

Statement of scale (architectural)

Issuing jurisdiction and denomination (philatelic)

Dates of creation area

Date(s)

  • [1991] (Creation)

Physical description area

Physical description

1 videocassette (63 min.) : Hi-8 format analogue television tape, cassette, sd., col.

Publisher's series area

Title proper of publisher's series

Parallel titles of publisher's series

Other title information of publisher's series

Statement of responsibility relating to publisher's series

Numbering within publisher's series

Note on publisher's series

Archival description area

Name of creator

Custodial history

Scope and content

Item is original camera tape footage taken for the "Everest - Climb for hope" documentary. Includes footage of team members building a sled for use in the rescue of Tim (because Tim has an injured knee), men around the camp working and interacting, Ross on the radio discussing the details of the rescue of Tim with John, Mario, and the rest of the team up on the North Col., views from camp and of the North Col., team members in the communal tent making plans, night scenes of tents, supplies, and men with flashlights and packs heading out, preparing for the rescue of Tim, some footage of some of the rescue efforts, the successful arrival back at advanced base camp, the medical examination of Tim's knee at the advanced base camp, Tim talks a little to the camera after the examination and worries about not being able to ski again or take on his new job, the doctor reassures him that is is likely he will heal. Alan and Peter making a crutch for Tim out of tent pegs, foam, duct tape, wire, and a ski pole; Tim tries out the crutches and the team members goof around.

Notes area

Physical condition

Immediate source of acquisition

Arrangement

Language of material

Script of material

Location of originals

Availability of other formats

Available as MP4 and MOV.

Restrictions on access

Original source not available for viewing.

Terms governing use, reproduction, and publication

Finding aids

Associated / related material

Accruals

Other notes

  • General note: Minor picture breakup throughout tape. Audio is distorted as well. Tape was baked.

Standard number area

Standard number

Access points

Place access points

Name access points

Control area

Rights area

Related right

Act

Replicate

Restriction

Allow

Start date

End date

Rights holder

Rights note(s)

Basis

Copyright

Copyright status

Under copyright

Copyright status date

Copyright jurisdiction

Copyright note

Digital object metadata

Filename

d9b89907-a4f8-4479-bb7a-eed0c50a1333-MI-466.mp4

Mime-type

video/mp4

Filesize

2 GiB

Digital object (Master) rights area

Digital object (Reference) rights area

Digital object (Thumbnail) rights area

Actions